BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a mixed-use development in Nespelem, Washington. Completed plans call for site work for a detention facility; sidewalk / parking lot; and water / sewer project.

1. Bidder shall furnish all labor, equipment and materials required for replacement of existing Lighting with LED lights in areas identified by Corrections staff. Colville Tribal Correctional Facility reserves the right to reduce or add to the scope of work. 2. All materials and methods shall meet requirements of life safety codes, ADA, building codes, Corrections codes and accepted trade practices. Materials purchased through this contract must be new and unused. 3. Work with authorized Correctional personnel to develop a work plan and time line. 4. Remove and dispose of any and all old lighting and materials: Old material MUST be removed from site. 5. Clean up and remove all waste and debris created by contractor. 6. Product Data to be submitted on, fitting and hardware 7. Other requirements a. Supply material according b. Perform installation according to industry standard c. Perform work according to and meeting, WSDOT, DOJ, BIA Office of facilities Management and construction design, and current WA correction standards d. All work must meet and or exceed current Corrections Industry standards Request for Proposal: Remove and replace all existing sprinkler heads, electronic sprinkler valves, that will work with current sprinkler controls, all shut off valves including the main 2 water shut offs, stand pipe for winterization, all control valve boxes, add additional electronic sprinkler valves to outer parking lot area interfacing with the current system of Correction Facility / Courts building. The Confederated Tribes of the Colville Reservation (Colville Tribes) seeks proposals from qualified contractors who have experience, expertise and equipment necessary to remove and replace all existing sprinkler heads, electronic sprinkler valves, that will work with current sprinkler controls, all shut off valves including the main 2 water shut offs, stand pipe for winterization, all control valve boxes, add additional electronic sprinkler valves to outer parking lot area interfacing with the current system of Correction Facility / Courts building. Corrections Facility at Colville Tribal Correctional Facility located at 44 Schoolhouse Loop Rd in Nespelem, Washington 99155. Contractor has to be SAM.GOV registered and provide copy and use Davis Bacon wages. All proposals and accompanying documentation will become the property of the Tribes and will not be returned. Contractors accept all risk of late delivery of proposal regardless of fault. Proposals must be directed to Dorthey Zacherle, Contract Officer, PO Box 150/21 Colville Street, Nespelem, WA 99155 or dorthey.zacherle@colvilletribes.com. Question Deadline 10/30/2024 at 3:00 PM PT Requests for interpretation/clarification of this RFP must be emailed to Bryan.McCleary.cor@colvilletribes.com. Unauthorized contact with other tribal employees regarding this RFP may result in disqualification. All oral communications will be considered unofficial and nonbinding on the Tribes. All responses will be posted electronically no later than 4:00 p.m. PST on the seventh business day after receipt of the question. The Tribes reserves the right to reject any or all proposals, to waive any minor informalities or irregularities contained in any proposal, and to accept any proposal deemed to be in the best interest of the Tribes. The Tribes anticipates the service period for this work to be for approximately 30 days. However, if the work extends beyond this period, and as stated in Section 2.12, any agreement would be require an agreed-upon modification to the term to continue.

Post-Bid

Water / Sewer

$520,000.00

Public - Federal

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
8
Active Projects
3
Bidding Soon
70
All Active Projects
18
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 12, 2024

December 12, 2024

img_map_placeholder

44 Schoolhouse Loop Rd, Nespelem, WA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.