BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Renovation of a municipal facility in Miami, Florida. Completed plans call for the renovation of a municipal facility.

Financial Project No.: 4450063 -1-52-01 Contract No.: F6011 Project Name: District Six Sunguide Chiller Replacement Project Project Location: Sunguide Building1001 Nw 111th Ave. Miami Fl. 33172 Project Description: Sunguide Chiller Replacement Owner representatives will be present to discuss plans, specifications, and conditions of the project. The Owner's Project Manager is: RUEL UMBAY and may be reached at: D6.purch@dot.state.fl.us Site Visit: Prospective Bidders Can Contact the Procurement Office at D6.purch@dot.state.fl.us to Request and Make Arrangement for a Site Visit. If the bid amount exceeds $100,000, the bidder must provide with the bid, a Bid Guaranty of five percent (5%) of the actual total bid in the form of a certified check, cashier's check, treasurer's check, bank draft of any national or state bank, or a surety Bid Bond made payable to the Department of Transportation. A Bid Guaranty in an amount less than five percent (5%) of the actual bid will invalidate the bid. Bid Bonds shall conform to the Departments Bid/Proposal Bond Form furnished with the proposal package. Each bidder shall submit a current license issued by the State of Florida (specify type license required for the work) and, if a Florida Corporation, a copy of the Corporate Charter as of their eligibility with the bid document to the Department of Transportation, Contracts Administration Office: D6.Purch@dot.state.fl.us Question Deadline 10/14/2024 at 5:00 PM ET Via Email: D6.Purch@dot.state.fl.us There is no deadline for administrative questions If the contract award amount exceeds $100,000, both a Performance Bond and a Labor and Material Payment Bond of 100% each of the contract sum are required at the time of award. FDOT - Call Order:- District Six Sunguide Chiller Replacement Project

Award

Municipal

$257,444.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

9

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
109
Active Projects
51
Bidding Soon
1,113
All Active Projects
459
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.