Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 13, 2025 at 8:00 PM
Updated August 14, 2025
Renovation of a municipal facility in Ponce de Leon, Florida. Completed plans call for the renovation of a municipal facility.
As of August 13, 2025, this project is under construction. Construction began on August 1, 2025 and should be completed on or before February 27, 2026. Financial Project No.: 45392915201, 44833035201 Contract No.: F3y31 Project Name: Fdot D3 Ponce De Leon Chiller Replacement Project Location: Ponce De Leon Operations Center, 1723 Sunrise Circle, Ponce De Leon Fl. 32455. Project Description: Replace Existing Chiller With New 60 Ton Air Cooled Scroll Package Chiller If a pre-bid meeting is scheduled (mandatory "or" non-mandatory) it will be held at the following location, date and local time: Onsite visits can be coordinated through our Department project manager Eric Pettis at 850-330-1316. Owner representatives will be present to discuss plans, specifications, and conditions of the project. The Owner's Project Manager is: Eric Pettis and may be reached at: 850-330-1316. Bid Proposal documents will not be issued after: October 21, 2024 @ 10:00 A.M. If the bid amount exceeds $100,000, the bidder must provide with the bid, a Bid Guaranty of five percent (5%) of the actual total bid in the form of a certified check, cashier's check, treasurer's check, bank draft of any national or state bank, or a surety Bid Bond made payable to the Department of Transportation. A Bid Guaranty in an amount less than five percent (5%) of the actual bid will invalidate the bid. Bid Bonds shall conform to the Departments Bid/Proposal Bond Form furnished with the proposal package. Each bidder shall submit a current State Contractor License issued by the State of Florida and, if a Florida Corporation, a copy of the Corporate Charter as prequalification of their eligibility with the bid document to the Department of Transportation, Contracts Administration Office. If the contract award amount exceeds $100,000, both a Performance Bond and a Labor and Material Payment Bond of 100% each of the contract sum are required at the time of award. FDOT - FDOT D3 Ponce De Leon Chiller Replacement
Under Construction
Municipal
$500,000.00
Public - State/Provincial
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
8
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 22, 2024
August 1, 2025
1723 Sunrise Cir, Ponce de Leon, FL
Related To This Project
Ponce de Leon, FL
Bid Date: Apr 01 2025
Ponce de Leon, FL
Bid Date: May 29 2025
Ponce de Leon, FL
Bid Date: May 30 2024
Ponce de Leon, FL
Bid Date: Apr 25 2024
Ponce de Leon, FL
Bid Date: Jan 25 2024
Ponce de Leon, FL
Bid Date: Sep 28 2023
Ponce de Leon, FL
Bid Date: Aug 28 2023
Ponce de Leon, FL
Bid Date: Aug 29 2019
Ponce de Leon, FL
Bid Date: Apr 04 2023
Ponce de Leon, FL
Bid Date: Mar 09 2023
Ponce de Leon, FL
Bid Date: Oct 26 2022
Ponce de Leon, FL
Bid Date: Dec 13 2022
Key West Nas, FL
--
Ocala, FL
Bid Date: Nov 08 2024
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
