BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 23, 2024 at 7:00 PM

Updated December 24, 2024

Site work and new construction of a pre-engineered storage facility in Warwick, Rhode Island. Completed plans call for the construction of a pre-engineered storage facility; and for site work for a pre-engineered storage facility.

Pre-Engineered Metal Building for Warwick Police Department The CITY OF WARWICK, acting as duly authorized through its Purchasing Agent/Finance Director/Mayor, accepts the above bid and hereby enters into a contract with the above party to pay the bid price upon completion of the project or receipt of the goods unless another payment schedule is contained in the specifications. All terms of the specifications, both substantive and procedural, are made terms of this contract. For a bid to be awarded to a corporation, limited liability company or other legal entity, prior to commencing work under the awarded bid, that corporation, company or legal entity may be required to provide to the Purchasing Agent a Certificate of Good Standing dated no more than thirty (30) days prior to the date upon which the bid approval was made. Bid surety in the form of a certified bank check or original bid bond in the amount of ten (10) percent of the total bid price must be submitted with each bid. If a bid bond is submitted, it must be duly executed by the bidder as principal and having as surety thereon a surety company licensed to do business in the State of Rhode Island and approved by the owner. The successful bidder must furnish a performance and payment bond in the amount of 100 percent of the total bid price. The City reserves the right to terminate the contract or any part of the contract in the best interests of the City, upon 30-day notice to the contractor. The City will incur no liability for materials or services not yet ordered if it terminates in the best interests of the City. If the City terminates in the interests of the City after an order for materials or services has been placed, the contractor will be entitled to compensation upon submission of invoices and proper proof of claim, in that proportion which its services and products were satisfactorily rendered or provided, as well as expenses necessarily incurred in the performance of work up to time of termination. Question Deadline 10/28/2024 Please direct all questions related to the specifications outlined (beginning on page 9) to the issuing department's subject matter expert: Name: Scott Mangiagli Title: Project Manager Phone: 860-259-1730 Email: smangiagli@kba-architects.com The work is to be completed per the following schedule: 1. Start (Notice to Proceed): Late Winter 2025. 2. Final completion: December 31, 2025

Award

Warehouse / Distribution - Pre-Engineered Storage Building

$1,828,000.00

Public - City

New Construction, Site Work

38

25

23

2

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
582
Active Projects
273
Bidding Soon
3,958
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 30, 2024

November 29, 2024

Project location map

99 Veterans Memorial Dr, Warwick, RI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.