BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and new construction of an educational facility in Elgin, Texas. Completed plans call for the construction of a 168,500-square-foot educational facility; and for site work for a educational facility.

It is the intention of the Elgin Independent School District to select, via ONE-STEP PROCESS, Request for Proposals (RFP), a Construction Manager-at-Risk for the construction of the New Middle School 2, located at 2005 Farm to Market Rd 1704, Elgin, TX 78621. The selected CMAR will provide pre-construction and construction services for this 168,500 square foot facility, which is designed to accommodate 1,200 students. Project Overview: The New Middle School 2 project will be a ground-up construction of a state-of-the-art facility designed to serve up to 1,200 students .The scope includes site development, utilities, building construction, and installation of advanced technology and security systems. The CMAR will be responsible for delivering the project within the estimated budget of $73,135,259.00 for construction. 2.2 CMAR Services: The selected CMAR will provide the following services: o Pre-Construction Services: o Participate in design phase meetings with architects and EISD o Provide constructability reviews, value engineering, and cost estimating at various stages of design o Develop and update construction schedules and logistics plans o Assist with identifying potential cost-saving measures and alternatives o Coordinate bidding of subcontractors and suppliers o Construction Services: o Serve as the general contractor during construction, managing day-to-day operations o Oversee all subcontractor work and ensure compliance with design documents and safety protocols o Conduct quality control inspections and ensure adherence to the project schedule o Provide regular updates to EISD on construction progress and budget The CMAR will be responsible for ensuring the project meets all regulatory requirements and is delivered on time and within budget Question Deadline Oct 18, 2024 at 12:00 PM Intent to Bid Due Date: Nov 6th 2024, 12:00 PM CST

GC Bidding

Educational

$73,135,259.00

Public - City

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
90
Active Projects
51
Bidding Soon
2,402
All Active Projects
917
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 6, 2024

June 20, 2025

img_map_placeholder

2005 Farm to Market Rd 1704, Elgin, TX

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.