BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 7, 2024 at 7:00 PM

Updated November 8, 2024

Demolition, site work, paving and new construction of a civil project in Hazelton Township, Minnesota. Completed plans call for site work for a bridge / tunnel; for the construction of a bridge / tunnel; bridge / tunnel; and for paving for a bridge / tunnel.

Morrison Township Culvert/Bridge Replacement. The full project ad can be viewed at online. by following the Highway Construction link online. LOCATION TYPE OF WORK: Culvert/Bridge Replacement and Approach Grading on 430th St in Morrison Township Approximate Major Items of Work Are: Common Embankment (Cv), Cy 448 Aggregate Surfacing (Lv), Class 5, Cy 381 10x6 Precast Concrete Box Culv End Sect, Each 2 10x6 Precast Concrete Box Culvert, Lf 58 Granular Backfill (Lv), Cy 465 The County reserves the right to reject any or all bids and to waive any irregularities thereof.

Bid Results

Bridges / Tunnels

$171,149.00

Public - County

Demolition, New Construction, Paving, Site Work

14

5

6

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
45
Active Projects
18
Bidding Soon
395
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 4, 2024

December 4, 2024

Project location map

430th St, Hazelton Township, MN

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.