BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Renovation of a municipal facility in Los Angeles, California. Completed plans call for the renovation of a municipal facility.

For information or questions regarding this RFQ contact Remil S. Mangali at (213) 241-2180 or via email at remil.mangali@lausd.net and BVDBContracts@lausd.net. PROJECT SCOPE OF WORK (included but not limited to): The scope of work includes the complete modernization of fifteen (15) traction passenger elevators and two (2) hydraulic passenger elevators. This project will address all necessary updates to comply with current building, industry, and code standards and all necessary engineering, labor, materials, transportation, services, and equipment required by the Project Contract Documents to complete the work. The contract also includes interim preventive maintenance during the modernization phase and 24 months of warranty maintenance upon completion of the last elevator. PROJECT CONSTRUCTION PHASE The contractor shall provide a minimum of three (3) modernization crews until project completion with no more than one (1) elevator out in each group simultaneously. The schedule in Appendix XYZ...shall be completed by each contractor with their proposed schedule for the project. Each schedule will be reviewed and scored as part of this submission. The client can at any time re-prioritize an elevator's modernization sequence in the event it is in need of a major repair or the elevator has reoccurring service calls that are higher than deemed acceptable by LAUSD and/or LAUSD's elevator consultant. CONTRACT BOND ESTIMATE The District's Contract Bond Estimate is $14,142,000.00. Last Day for Request for Clarification December 13, 2024. Issue FINAL Addenda by December 16, 2024. Anticipated Start Date of Notice to Proceed January 2025. Substantial Completion (790 calendar days after NTP date) March 2027. Final Completion (820 calendar days after NTP date) April 2027.

GC Bidding

Municipal

$14,142,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
207
Active Projects
105
Bidding Soon
2,243
All Active Projects
998
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 19, 2024

January 1, 2025

img_map_placeholder

To Be Determined, Los Angeles, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.