Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 18, 2024 at 7:00 PM
Updated December 19, 2024
Renovation of a municipal facility in Los Angeles, California. Working plans call for the renovation of a municipal facility.
**Please be advised that this project has been cancelled. Project may be re-advertised in the future. For information or questions regarding this RFQ contact Remil S. Mangali at (213) 241-2180 or via email at remil.mangali@lausd.net and BVDBContracts@lausd.net. PROJECT SCOPE OF WORK (included but not limited to): The scope of work includes the complete modernization of fifteen (15) traction passenger elevators and two (2) hydraulic passenger elevators. This project will address all necessary updates to comply with current building, industry, and code standards and all necessary engineering, labor, materials, transportation, services, and equipment required by the Project Contract Documents to complete the work. The contract also includes interim preventive maintenance during the modernization phase and 24 months of warranty maintenance upon completion of the last elevator. PROJECT CONSTRUCTION PHASE The contractor shall provide a minimum of three (3) modernization crews until project completion with no more than one (1) elevator out in each group simultaneously. The schedule in Appendix XYZ...shall be completed by each contractor with their proposed schedule for the project. Each schedule will be reviewed and scored as part of this submission. The client can at any time re-prioritize an elevator's modernization sequence in the event it is in need of a major repair or the elevator has reoccurring service calls that are higher than deemed acceptable by LAUSD and/or LAUSD's elevator consultant. CONTRACT BOND ESTIMATE The District's Contract Bond Estimate is $14,142,000.00. Last Day for Request for Clarification December 13, 2024. Issue FINAL Addenda by December 16, 2024. Anticipated Start Date of Notice to Proceed January 2025. Substantial Completion (790 calendar days after NTP date) March 2027. Final Completion (820 calendar days after NTP date) April 2027.
Final Planning
Municipal
$14,142,000.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
6
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 19, 2024
January 1, 2025
To Be Determined, Los Angeles, CA
Related To This Project
Los Angeles, CA
Bid Date: Oct 29 2024
Los Angeles, CA
--
Los Angeles, CA
--
Los Angeles, CA
--
Los Angeles, CA
--
Los Angeles, CA
--
Los Angeles, CA
Bid Date: Feb 20 2025
Los Angeles, CA
--
Los Angeles, CA
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.