BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work and asbestos abatement for a residential development in Cheektowaga, New York. Completed plans call for the demolition of a 3,485-square-foot residential development; for site work for a residential development; and for asbestos abatement for a residential development.

As of November 1, 2024, this project has not yet been awarded. A timeline for award has not yet been established. For the controlled demolition with asbestos in place of structure(s) located on 82 Preston Road (Bid# 2024-34), in the Town of Cheektowaga, New York. The Town Board reserves the right to consider informal any bid not prepared and submitted in accordance with the provisions of the specification and contract documents, and may waive any informalities, make an award to other than the low bidder, or reject any or all bids should it be in the best interest of the Town. Address Inquiries to: CRAIG R. MACONAGHY, JR. Fire Inspector Town of Cheektowaga Office of Fire Safety (716) 686-3470 ITEM I. CONTROLLED DEMOLITION WITH ASBESTOS IN PLACE 82 Preston Road, Cheektowaga, New York (S.B.L. #90.76-4-6) Multi Family-Res, 2 Stories, Residential Structure, 5 bedroom, 2 bath, Garage, Heating only - forced air 2,094 sq.ft. TOTAL: 3,485 square feet lot The following shall be considered as the definitive Scope of Work for the Project Site. This document shall be used as part of and in conjunction with the attached specifications. (b) PLEASE NOTE: The structure(s) on the project site(s) has been ruled structurally unsafe by Craig R. Maconaghy, Jr., Fire Inspector. Additionally, the Town of Cheektowaga Supervising Code Enforcement Officer, Richard Coburn has determined that due to the unsafe and unstable areas of the structure on the project site, safe asbestos abatement is prohibited. Accordingly, no asbestos survey has been conducted. The entire demolition area at the project site shall be considered the regulated abatement work area, and controlled demolition and area containment measures and removal for the project site shall be in compliance with 12 NYCRR 56. (c) Photographs taken of the Project Site at the time of the initial inspection site are attached

Award

Residential Subdivision

$22,800.00

Public - City

Asbestos Abatement, Demolition, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
213
Active Projects
98
Bidding Soon
2,496
All Active Projects
1,062
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 30, 2024

November 29, 2024

img_map_placeholder

82 Preston Rd, Cheektowaga, NY

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.