Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 19, 2025 at 8:00 PM
Updated August 20, 2025
Site work and new construction of an educational facility in Wilson, North Carolina. Working plans call for the construction of a 30,000-square-foot educational facility; and for site work for a educational facility.
As of August 19, 2025, an architect and construction manager have been selected. Ground breaking is anticipated to begin in fall 2025. The owner has determined a prequalified list of design build companies. Project Site: North Campus at 587 Site, Wilson, NC. Design-Build Contracts, Wilson Community College is seeking proposals from qualified design-build teams interested in designing and constructing a single-level, 30,000 GSF training center at the North Campus at 587 Site. The facility will provide general laboratories and simulated cleanroom environments that facilitate knowledge-based and hands-on skills training on biomanufacturing processes and equipment, including procedures required to meet the expectations of agencies that regulate medical products. Approximately 50% of the space will be dedicated to laboratories, with the remaining 50% for general purpose classrooms, offices, storage, and utilities. Training spaces will feature the same process and testing equipment used by most companies that manufacture biopharmaceutical and industrial bioproducts. If local companies use specialized equipment, similar equipment will be installed in the training center. Flexibility in facility design is critical so that the laboratories and simulated cleanroom environments can be scheduled for academic courses, continuing education, and customized industry training; as well as be adaptable for emerging and/or shifting industry training needs. The aesthetic expectations include a building with an above-average number of external windows that allow natural light to enter 1) offices and hallways and 2) perimeter hallways surrounding laboratories that have internal windows for viewing purposes. Ample natural light should be a feature, as the Training Center should mirror the aesthetics of current biomanufacturing facilities. The laws of North Carolina and applicable regulations of licensing boards will be observed in receiving proposals and awarding the contract. The proposing firms must be properly licensed to provide Construction Services and Design Services in the State of North Carolina. Project Budget: $30,000,000 Project Schedule: Anticipated selection in November 2024, and 24-month design/construct schedule
Pre-Construction/Negotiated
Educational
$30,000,000.00
Public - City
New Construction, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 30, 2024
October 27, 2025
4100 NC-58, Wilson, NC
Related To This Project
Wilson, NC
Bid Date: Nov 06 2024
Wilson, NC
Bid Date: Oct 30 2024
Wilson, NC
Bid Date: Nov 12 2024
Wilson, NC
Bid Date: Nov 26 2024
Wilson, NC
Bid Date: Nov 20 2024
Wilson, NC
Bid Date: Jan 07 2025
Wilson, NC
Bid Date: Nov 28 2024
Wilson, NC
Bid Date: Dec 18 2024
Wilson, NC
Bid Date: Oct 14 2024
Wilson, NC
--
Wilson, NC
--
Wilson, NC
Bid Date: Sep 26 2024
Wilson, NC
Bid Date: Sep 25 2024
Wilson, NC
Bid Date: Sep 04 2024
Wilson, NC
Bid Date: Aug 27 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
