BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Demolition and site work for a municipal facility in Victorville, California. Completed plans call for the demolition of a municipal facility; and for site work for a 56,664-square-foot, two-story above grade municipal facility.

The project involves the demolition of Building 321 interior, while preserving the existing exterior shell. Building 321 is approximately 56,664 sq. ft., two stories, and a basement; the work shall include labor, tools, finishing, clean up, and incidentals required for the proper completion of the work. For more information, contact Celeste Calderon at (760) 955-5082 or cmcalderon@victorvilleca.gov. This project involves the demolition of Building 321 interior, while preserving the existing exterior shell. Building 321 is approximately 56,664 sq. ft., two stories, and a basement. The Contractor shall remove all non-structural interior elements, including but not limited to interior partition walls and framing, ceilings and ceiling tiles, flooring material, interior doors, windows, and fixtures, mechanical, electrical, and plumbing systems. The Contractor shall protect in place the elevator and elevator shaft liner. The Contractor shall avoid damages to the exterior shell, load-bearing walls, and structural elements. The Contractor shall cap all electricity, gas, water, sewer, and telecommunications. Demolition operations shall be in accordance with State, federal, and local regulations. The Contractor shall sort and separate demolition debris for recycling and disposal in accordance with Federal, State, local regulations. The Contractor shall transport and dispose of all demolition materials to a licensed facility and provide SCLAA with weight ticket. The Contractor shall remove all graffiti on the exterior walls of Building 321. The Contractor shall clean the interior space thoroughly after demolition is complete, removing dust, debris, and any remaining equipment. The Contractor shall clean up all broken glass around the outside of the building. The Contractor shall be responsible for confirming all building dimensions and square footage of the building prior to bidding. The Contractor shall be responsible for the security of their equipment at all times. General Provision o Mobilization shall be limited to 6 percent of the grand total project cost. o A working day shall be any day other than a legal holiday, Saturday, or Sunday on which the normal working forces of the Contractor may proceed with regular work for at least (6) hours toward completion of the contract. When work is suspended for causes beyond the Contractors control, it shall not be counted as a working day. Saturdays, Sundays, and holidays on which the Contractors forces engage in regular work shall be considered as working days. Working days for this project shall be Monday-Friday, 6:30 A.M. until 4:30 P.M. o The Contractor shall obtain a City of Victorville business license. o The SCLAA shall obtain Building permits and the Mojave Desert Air Quality Management District permit prior to commencing work. o The Contractor shall be required to furnish all labor, equipment, supplies, transportation, and storage to perform all operations necessary to complete the project. o The Contractor shall be responsible for hauling away all debris from the job site in compliance with all Local, State, and Federal regulations. Landfill site disposal trip tickets must be remitted to the Authority prior to payment. o The Contractor shall submit product submittals for approval prior to use. o A pre-construction meeting shall be held with appropriate tenants and airport staff prior to work commencing. The Contractor shall provide a schedule prior to the pre-construction meeting. o The Contractor shall hold bids for at least 60 days. o The Contractor shall provide a standard one-year Public Works warranty. No additional warranty requested. This project shall be scheduled to be completed within 60 calendar days.

Sub-Bidding

Municipal

$500,000.00

Public - City

Demolition, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
196
Active Projects
101
Bidding Soon
2,131
All Active Projects
966
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 10, 2024

December 16, 2024

img_map_placeholder

18374 Phantom W, Victorville, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.