BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 16, 2025 at 8:00 PM

Updated September 17, 2025

Site work and paving for a road / highway in Cathedral City, California. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Engineer's Estimate: $493,500. SB 821 - Perez Road From Cathedral Canyon Drive to Date Palm Drive Class Iv Separated Bikeways Question Deadline 08/07/2025 Requests for an interpretation shall be made in writing and delivered at least five (5) days before the time announced for opening the bids to: Andrew Lee Assistant Engineer City of Cathedral City 68-700 Avenida Lalo Guerrero Cathedral City, CA 92234 alee@cathedralcity.gov Phone: (760) 770-0319 Fax: (760) 202-1460 The scope of work consists of furnishing all supervision and labor, materials, necessary equipment and tools, and traffic control required for the completion of the Project. The proposed improvements include crack seal and slurry seal of existing roadway, signing and striping improvements, and installation of flexible delineators. All work and resulting facilities will fully conform to the current adopted Coachella Valley State Implementation Plan (CVSIP) for PM-10 including Best Management Practices during the construction process. All project work and incidental items to complete the project shall be performed in accordance with the plans, specifications, and other provisions of the contract. All the above improvements are to be constructed in a workmanlike manner, leaving the entire project in a neat and presentable condition This project is to be completed within 45 working days from the date specified in the Notice to Proceed. Time for commencement and completion of the work is important, and is to be of the essence of the Contract. The successful bidder should plan to order any long lead-time equipment items immediately following Notice of Award. The successful bidder will be required to furnish a Labor and Materials bond in the amount equal to one hundred percent (100%) of the Contract price, as well as a Faithful Performance Bond, in the amount equal to one hundred percent (100%) of the Contract price. The City reserves the right to reject any or all bids, to waive any irregularity, to accept any bid or portion thereof, and to take all bids under advisement for a period of forty-five (45) days.

Award

Roads / Highways

$249,590.00

Public - City

Paving, Site Work

4

7

2

5

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
81
Active Projects
1
Bidding Soon
764
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 12, 2025

September 11, 2025

Project location map

Perez Rd, Cathedral City, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.