BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a road / highway in Los Angeles, California. Completed plans call for site work for a road / highway.

Description Only the following five Contractors can bid on this project as a Prime Contractor: o Calex Engineering o Clarke Contracting o Jilk Heavy Construction, Inc. o Mike Prlich & Sons, Inc. o Mladen Buntich Construction Company Provide emergency erosion control mitigation measures to protect & repair damaged streets/right-of-way from further storm damage, as needed. The work will consist of: Removal of old & deteriorated sandbags, placement of new sandbags Removal of old and damaged AC paving & AC berm, installation of new AC paving Construction of a pipe and board structure Removal and haul away of soil, rock, weathered bedrock, & construction debris. All contract work must be completed within 42 calendar days from the NTP. After the contract work is completed, the project/contract will remain open for several months to address potential additional damage that arises during the rainy season. See bid package for full scope & details Bid package only on RAMP- if you're one of the prequalified contractors, download it to be a plan holder Requests for clarification of conflicts and omissions from the contract documents shall be addressed in writing to Daniel Orris Geotechnical Engineering Division 1149 S. Broadway, 1 st Floor Los Angeles, CA 90015 Email: daniel.orris@lacity.org This project provides emergency erosion control mitigation measures to protect and repair damaged streets and right-of-way from further storm damage, as needed. These conditions of damaged streets during rain events are a threat to public safety. The implementation of erosion control measures will assist in safe passage to pedestrians and use of roadway, as well as to reduce further deterioration of the damage. The work will consist of the removal of old and deteriorated sandbags, placement of new sandbags, removal of old and damaged asphalt concrete (AC) paving and AC berm, installation of new AC paving, construction of a pipe and board structure, and removal and haul away of soil, rock, weathered bedrock, and construction debris. All contract work must be completed within 42 calendar days from the NTP. After the contract work is completed, the project/contract will remain open for several months to address potential additional damages that arise during the rainy season.

Bid Results

Roads / Highways

$184,029.00

Public - City

Site Work

6

15

3

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
207
Active Projects
105
Bidding Soon
2,243
All Active Projects
998
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 23, 2024

November 22, 2024

img_map_placeholder

Multiple Locations, Los Angeles, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.