BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and asbestos abatement for a municipal facility in Parker, South Dakota. Completed plans call for site work for a municipal facility; and for asbestos abatement for a municipal facility.

Questions Due: October 10, 2024 by 5:00 PM Request for Proposal (RFP) for Asbestos Abatement Services October 1, 2024 Section One: General Information The TEGRA GROUP has been retained by Turner County (Owner) to provide Owner Representation for a proposed new county courthouse in Turner County, South Dakota. Turner County, hereinafter referred to as the Owner, is issuing this Request for Proposal (RFP) to solicit proposals from qualified contractors for asbestos abatement services at the Turner County Courthouse. The selected contractor will be responsible for the safe removal, transportation, and disposal of asbestos-containing materials (ACM) in accordance with federal, state, and local regulations. Section Two: Project Overview The asbestos abatement project will take place at 400 S. Main St., Parker, SD 57053. The primary goal is to remove ACMs in the most efficient, safe, and compliant manner while minimizing disruption to normal operations. Completed work will result in a facility that is ready for demolition. The scope of work includes but is not limited to: Identification of asbestos-containing materials (if not pre-identified) Proper containment, removal, and disposal of asbestos materials Post-abatement air monitoring and clearance testing Compliance with all applicable safety and environmental regulations Section Three: Scope of Work The contractor will be responsible for the following tasks: Pre-Abatement Activities: Review of asbestos survey reports and perform additional testing, if necessary. Development and submission of a site-specific abatement work plan. Obtain necessary permits and approvals. Notification to regulatory agencies, as required by law. Abatement Activities: Preparation of the site, including containment and ventilation setup. Removal of identified ACMs in accordance with the abatement plan. Proper handling, packaging, and disposal of ACMs at an approved facility. Daily site cleaning and decontamination. Post-Abatement Activities: Conduct clearance air testing and provide reports. Dismantling of containment areas and site restoration. Final clearance report submission to the Owner. Section Four: Qualifications To be considered for this project, the contractor must meet the following qualifications: Licensed asbestos abatement contractor with South Dakota credentials. Demonstrated knowledge of federal, state, and local asbestos regulations, including OSHA, EPA, and NESHAP standards. Experience with similar projects. Comprehensive insurance coverage, including liability and workers compensation. Section Five: Proposal Requirements Interested contractors should submit a detailed proposal, including the following: Company Information: Company name, address, and contact information. Proof of licensure and certifications. Company history and relevant experience. Technical Proposal: Detailed work plan and project approach. Description of containment, removal, and disposal methods. Health and safety plan. Compliance with regulatory requirements. Cost Proposal: Itemized breakdown of costs, including labor, materials, permits, equipment, and disposal fees. Total estimated cost for the project. Schedule: Project timeline from mobilization to completion. Proposed start and completion dates. References: At least three references from recent asbestos abatement projects of similar size and scope. Questions should be directed to: Tyler Klatt tklatt@tegragroup.com 605-881-3015 Responses to questions will be shared with all bidders by October 11, 2024. Section Ten: Terms and Conditions All bids shall be valid for acceptance by the Owner for a period of Sixty (60) days after the submission of the bids. The Owner reserves the right to reject any or all proposals, waive any irregularities, or award the work to someone other than the low bidder The selected contractor must sign a formal agreement before work begins

Post-Bid

Municipal

$600,000.00

Public - County

Asbestos Abatement, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
20
Active Projects
15
Bidding Soon
228
All Active Projects
113
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 29, 2024

November 28, 2024

img_map_placeholder

400 S Main St, Parker, SD

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.