BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a mixed-use development in Ina, Illinois. Completed plans call for site work for a water / sewer project; and detention facility.

The work included in this project is as follows: the surface preparation and recoating of the water tower; welding and grinding; sealing of the foundation; installation of roof handrail; overflow flap valve, tank drain, safety signage, grounding system; replacement of roof hatches, ladders, safety climb systems, aviation light fixture, tank vent, altitude valve; piping modifications; removal of cathodic protection system; and miscellaneous associated work. COST RANGE - under $1,000,000 Contractor shall not pay less than the prevailing rates of wages to all laborers, workmen, and mechanics performing work under this contract, and shall comply with the requirements of the Prevailing Wage Act (820 ILCS 130/1-12). DESCRIPTION: The work included in this project is as follows: the surface preparation and recoating of the water tower; welding and grinding; sealing of the foundation; installation of roof handrail, overflow flap valve, tank drain, safety signage, grounding system; replacement of roof hatches, ladders, safety climb systems, aviation light fixture, tank vent, altitude valve; piping modifications; removal of cathodic protection system; and miscellaneous associated work. B. EXISTING CONDITIONS: The site is located south of the City of Ina, north of East Franklin Road and west of Highway 37, in Jefferson County. The water tower is aging and the coatings are failing, allowing corrosion of the steel. Several of the water tower features need replaced to be in compliance with modern codes and standards. The water tower needs several repairs and upgrades to allow it to function properly well into the future VBE/PBE - 2% Combined

Post-Bid

Water / Sewer

$1,000,000.00

Public - State/Provincial

Site Work

29

13

2

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
63
Active Projects
42
Bidding Soon
480
All Active Projects
204
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 26, 2024

January 27, 2025

img_map_placeholder

251 IL-37, Ina, IL

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.