BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and outdoor lighting for a mixed-use development in Kahului, Hawaii. Conceptual plans call for site work for a transportation facility; for outdoor lighting for a transportation facility; and for paving for a transportation facility.

The project scope includes the preparation of plans, specifications, cost estimates, and other engineering reports needed for the site clearing and infrastructure work needed to support a future fuel rack at OGG (the design of the fuel rack itself is not part of this solicitation). Improvements and preparation may include, but are not limited to, area grading to the same level as the existing adjacent airport cargo facilities, extension of underground fuel lines and utilities to the prepared site, construction of a vehicle roadway between the new fuel rack and aircraft apron, extending the existing apron and drain lines to the south immediately fronting the cargo facility, new apron lighting, new apron edge lighting, new Air Operation Area (AOA) security fencing, new AOA gate, utility relocation work, and access roadway intersection improvements. Hazardous materials may be encountered within the project limits. These services are anticipated to be immediately required, and the completion of design plans, specifications, cost estimates, and associated reports shall be due within ONE-THOUSAND EIGHTHUNDRED TWENTY-FIVE (1,825) calendar days from the Notice to Proceed. The contract shall be a Lump Sum contract in accordance with HAR 3-122-136, with an overall contract time of performance of five (5) years. Individuals or firms shall email a PDF file of their response to the attached written questionnaire If there are any questions, please contact Fernand Joshua Guiang, Project Manager, at (808) 838-8837 or via email at fernandjoshua.m.guiang@hawaii.gov.

Conceptual

Transportation Terminals

$30,000,000.00

Public - State/Provincial

Outdoor Lighting, Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
7
Active Projects
4
Bidding Soon
32
All Active Projects
18
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 11, 2025

img_map_placeholder

1 Keolani Pl, Kahului, HI

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.