BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 15, 2024 at 8:00 PM

Updated October 31, 2024

Site work, paving and outdoor lighting for a mixed-use development in Polson, Montana. Working plans call for site work for a transportation facility; for outdoor lighting for a transportation facility; for paving for a transportation facility; and water / sewer project.

Polson Airport Improvement Project * Earthwork (P-152): 15,600 CY * Asphalt Pulverizing: 54,500 SY * Asphalt Milling: 19,500 SY * Subbase Course (P-154): 9,500 CY * Base Course (P-208): 8,000 CY * Asphalt (P-403): 13,000 TONS * Seal Coat (P-609): 9,950 SY * Airfield Paint (P-620): 26,200 SF * Underdrains/Edge Drains: 19,000 LF * Runway Medium Intensity Lighting and cable will be replaced on existing/adjusted base cans. Primary wind cone and supplemental wind cone to be replaced. Runway 36 Precision Approach Path Indicator (PAPI) to be replaced. Runway guidance signs to be replaced. New electrical vault with new constant current regulator. * Airport Beacon to be replaced with new LED beacon on 55' tilt-down tower. The project is contingent on receipt of FAA funding and there will be additive alternates keep the project within available funding. The current engineer's estimate is $5,500,000 - $7,000,000 for the project. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Final Planning

Transportation Terminals

$7,000,000.00

Public - City

Outdoor Lighting, Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
10
Active Projects
1
Bidding Soon
109
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 14, 2025

Project location map

To Be Determined, Polson, MT


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.