BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Bellevue, Nebraska. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The Project consists of the construction of an earthen/sand/rock river side berm and structural improvements to a haul road within the SID. Work includes excavation/removal and disposal of accumulated debris; earthwork, sheet pile placement and placement of rock riprap provided from an adjacent project excavating rock from the Platte River. Coordination between the two projects is required. Also included are construction of temporary site access, tree removal, traffic control and site restoration. Question Deadline 10/31/2024 Questions received less than seven days prior to the date for opening of Bids may not be answered. Questions about Bidding Documents can be made via email or phone to the project Engineer: Houston Engineering, Inc. Michael K. Sotak, PE, BC.WRE 12702 Westport Parkway, Suite 300, Omaha, NE 68138 MSotak@houstoneng.com 402-934-8328 Bidding Documents also may be examined at the office of the Project Engineer, Houston Engineering, 12702 Westport Parkway, Omaha, NE 68138. Neither Owner nor Engineer will be responsible for full or partial sets of Bidding Documents, including Addenda if any, obtained from sources other than the Issuing Office. Questions about Bidding Documents can be made via email or phone to the project Engineer: Houston Engineering, Inc. Michael K. Sotak, PE, BC.WRE 12702 Westport Parkway, Suite 300, Omaha, NE 68138 MSotak@houstoneng.com 402-934-8328 The Engineer's cost estimate for this Project Contract is $3,250,000.00. The Contractor's bid bond, certified check, or cashier's check shall be in an amount of 5% of the Engineer's estimate ($160,250.00) made payable to the Treasurer of Sanitary and Improvement District No. 101 of Sarpy County, Nebraska. The certified or cashier's check may be cashed by the Owner, or the bid bond. forfeited to the Owner as liquidated damages in the event the successful bidder fails to enter into a Contract and file an acceptable bond satisfactory to the Owner assuring the faithful fulfillment of the Contract and maintenance of said improvements, as required by law, within ten days after the acceptance of the Contractor's bid. No Bidder shall withdraw his Bid within 30 days after the actual date of the opening thereof. Each bid shall be accompanied in a separate sealed envelope by the certified check or bid bond. The Owner reserves the right to reject any and all bids, to waive irregularities and informalities therein and to award the Contract in the best interest of the Owner

Post-Bid

Roads / Highways

$3,250,000.00

Public - County

Paving, Site Work

31

12

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
58
Active Projects
32
Bidding Soon
509
All Active Projects
269
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.