BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 20, 2024 at 7:00 PM

Updated November 21, 2024

Site work and paving for a road / highway in Lower Pottsgrove Township, Pennsylvania. Working plans call for site work for a road / highway; and for paving for a road / highway.

As of November 20, 2024, bids received were rejected as they were over the budget. Upper Pottsgrove Township Farmington Avenue Paving Project Pottstown, PA Question Deadline 10/25/2024 at 12:00 PM ET Questions regarding this project shall be submitted via the Ask a Question feature in online. Location : Online portal. A certified check or bank draft, payable to the order of Upper Pottsgrove Township, negotiable U.S. Government Bonds (at par value), or a satisfactory Bid Bond executed by the Bidder and an acceptable surety, in an amount equal to ten percent (10%) of the total bid amount, shall be submitted with each Bid. Bonds are to be issued by a surety licensed to do business in the Commonwealth of Pennsylvania. The successful Bidder will be required to furnish and pay for a satisfactory Performance and Payment Bond and Labor and Materialmen's Bond. Attention is called to the fact that not less than the minimum salaries and wages as set forth in the Contract Documents must be paid on this project, and that the Contractor must ensure that employees and applicants for employment are not discriminated against because of their race, color, religion, sex or national origin. Upper Pottsgrove Township reserves the right to reject any or all Bids or to waive any informalities or irregularities in the bidding when, in the opinion of the Owner, such rejections or waivers shall be to its interest or advantage. Prior to awarding the contract, bids may be held by Upper Pottsgrove Township for a period not to exceed sixty (60) days from the date of bid opening for the purpose of reviewing the Bids and investigating the qualifications of bidders. The scope of the project involves the milling, removal and disposal of asphalt paving, the installation of a base course of asphalt paving and the installation of "oil & chips" along the entire length of Farmington Avenue within the limits of Upper Pottsgrove Township.

Final Planning

Roads / Highways

$1,256,870.00

Public - City

Paving, Site Work

7

10

5

4

Subscribe For Documents

55 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
772
Active Projects
420
Bidding Soon
4,685
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 6, 2024

May 5, 2025

Project location map

Farmington Ave, Lower Pottsgrove Township, PA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.