EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 12, 2025 at 7:00 PM

Updated October 1, 2024

Renovation of a water / sewer project in Snohomish, Washington. Completed plans call for the renovation of a water / sewer project.

The City of Snohomish is seeking a contractor to furnish all labor, tools, materials, and equipment necessary to complete the Motor Control Center (MCC) and Generator Replacement project at the Snohomish Wastewater Treatment Plant (WWTP). The work to be performed under this contract includes, but is not limited to, the following: o Measures for temporary erosion and sediment control. o Remove and salvage the existing emergency generator to the Owner and demolish associated appurtenances, duct, conduit, wire, and fuel piping inside the existing Generator Building. o Demolish the existing diesel storage tank and associated appurtenances, bollards, conduit, wire, and fuel piping. o Repair of the existing Generator Building roof following demolition of the existing generator exhaust duct. o Demolish the Generator Building inlet and exhaust louvers and replacement with new wall sections and windows. All bid proposals shall be accompanied by a bid proposal deposit in cash, certified check, cashier's check, or surety bond in an amount equal to five percent (5%) of the grand total amount of such bid proposal, AND LIST OF SUBCONTRACTORS. NO BID SHALL BE CONSIDERED UNLESS ACCOMPANIED BY SUCH BID PROPOSAL DEPOSIT. If the successful bidder does not enter into a contract and file a performance and payment bond and the required insurance certificates, with the City of Snohomish within ten (10) working days after Notice of Award of Bid, the amount of the bid deposit shall be forfeited to the City of Snohomish. Unsuccessful bidders' deposits will be returned upon City's execution of contract documents or rejection of all bids. A one hundred percent (100%) Contractor's Performance and Payment Bond is required. The bond must be delivered to the Snohomish City Clerk within ten (10) working days after notification of the award to the successful bidder. The Bond must be approved by City officials before the contract award is final. A Contract is required and must be executed and returned to the City of Snohomish within ten (10) working days after notification of award. Engineer's Estimate: $1,300,000 The City of Snohomish reserves the right to reject any or all bids, and to waive irregularities or informalities in the bid or in the opening. The City of Snohomish reserves the right to delete portions of the work. No bidder may withdraw his bid after the hour set for the opening thereof, or before award of contract, unless said award is delayed for a period exceeding sixty (60) calendar days. The bidder further agrees to begin work within ten (10) working days after Notice to Proceed has been issued by the City of Snohomish. The Contractor has Two Hundred Twenty (220) working days to complete the construction of the project. Bid Package and technical related questions can be directed to Project Engineer, Cory Morton, P.E., at (360) 282-3196. Questions must be received no later than 5:00 PM (Pacific Time) on Tuesday, February 4 th 2025. Questions received after this date will not be answered.

Post-Bid

Water / Sewer

$1,300,000.00

Public - City

Renovation

83

24

2

2

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Construction Facilities, Vehicular Access and Parking, Traffic Control, Temporary Controls, Temporary Erosion and Sediment Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Closeout Submittals, Maintenance Data
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Existing Conditions, Common Work Results for Existing Conditions, Subsurface Investigation, Material Testing, Site Remediation, Contaminated Site Material Removal, Hazardous Waste Recovery Processes
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Concrete Unit Masonry
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Windows, Aluminum Windows, Bronze Windows, Stainless-Steel Windows, Steel Windows, Hardware, Door Hardware, Glazing, Glass Glazing, Louvers and Vents, Vents
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Vehicle Service Equipment, Parking Control Equipment
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Scaffolding
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Low-Voltage Electrical Distribution, Low-Voltage Switchgear, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Earthwork Methods, Soil Stabilization, Shotcrete Soil Slope Stabilization
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Bases, Ballasts, and Paving, Planting, Planting Preparation, Mulching
Division 33 - Utilities

Division 33 - Utilities

Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation, Transportation Signaling and Control Equipment, Railway Signaling and Control Equipment, Supervisory Control and Data Acquisition
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Lifting Devices, Hooks

Find More Local Projects

Within 75 Miles of This Project
113
Active Projects
57
Bidding Soon
1,049
All Active Projects
439
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 11, 2025

April 14, 2025

img_map_placeholder

2129 2nd St, Snohomish, WA

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Wastewater Treatment Plant Motor Control Center and Generator Replacement

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.