BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 2, 2024 at 7:00 PM

Updated December 3, 2024

Site work for a water / sewer project in Joplin, Missouri. Completed plans call for site work for a water / sewer project.

Bidder will receive an email from do_not_reply@amwater-ccc.coupahost.com to participate in bidding event from the Owner's e-procurement system. The link included in the email Bidders receive is unique and can be shared with others. Please be mindful of whom you share that link with and also do NOT delete the email. This link is the only way a Bidder can access the Bidding event on behalf of your organization. The Project generally consists of open cut installation of 7,804 LF of 12-inch diameter ductile iron water line, bored installation of 745 LF of 12-inch diameter ductile iron water line, and all other miscellaneous work required for completion of the project. Nondiscrimination in Employment: Bidders on this work will be required to comply with the President's Executive Order Number 11246. Requirements for bidders and contractors under this order are explained in the specifications. The Owner reserves the right to waive any informalities or minor defects or to reject any or all bids and to readvertise and to rebid. Each Bidder must deposit with his bid, security in the amount of five percent (5%) of his base bid, which is subject to conditions provided in the Instructions to Bidders. No Bidder may withdraw his bid within sixty (60) calendar days after the actual date of the opening thereof. Attention of the Bidder is particularly called to the requirements as to conditions of employment to be observed, and that the Bidder must comply with the payment of hourly wage rates, including all fringe benefits, as established by Sections 290.210-340, RsMO, as amended in 1993, pertaining to the prevailing hourly rate of wages and including fringe benefits, as established by the Department of Labor and Industrial Relations of the State of Missouri. A copy of the determination is provided within the Supplemental General Conditions. Bidders with questions concerning this Invitation may contact Grant Alumbaugh of Missouri American Water or Garrett Wagner, P.E. of Allgeier, Martin and Associates, Inc. at (417) 680-7200. (075)

Post-Bid

Water / Sewer

$1,905,000.00

Public - State/Provincial

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
136
Active Projects
67
Bidding Soon
906
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 15, 2024

December 16, 2024

Project location map

E 7th St, Joplin, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.