BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 6, 2024 at 7:00 PM

Updated November 7, 2024

Site work and paving for a civil project in Andover, Massachusetts. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; and water / sewer project.

Project Install approx 3,200 LF of 20-inch to 6-inch cement lined DI water mains on Lowell St, culvert crossings; hydrants/valves/hydrant laterals; water services/corporations, PE Tubing, curb stops/boxes; paving Question Deadline 10/25/2024 at 3:00 PM ET Questions will be receive If you have any questions or desire further information about filing electronically Contractor Qualification Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. Project includes installing approximately 3,200 LF of 20-inch to 6-inch cement lined ductile iron water mains on Lowell Street in Andover, MA to replace the existing 12-inch cast iron water main; 12-inch connections, and 8-inch water mains; culvert crossings; hydrants, including valves and hydrant laterals; water services including corporations, polyethylene tubing, curb stops and curb stop boxes; temporary trench pavement and permanent mill & overlay; temporary bypass piping; complete restoration of public and private property to pre-construction conditions; and all materials and equipment, construction, and services inherent to the Work

Bid Results

Water / Sewer

$1,220,186.00

Public - City

Paving, Site Work

21

19

2

2

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
154
Active Projects
3
Bidding Soon
2,112
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 1, 2024

December 31, 2024

Project location map

Lowell St, Andover, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.