BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a fitness / recreation center in Sturbridge, Massachusetts. Completed plans call for the renovation of a fitness / recreation center.

Cedar Recreation Roof Replacements Bathhouse and pavilion roofs at 60 Cedar Street, Sturbridge MA 01566. Estimated Cost $24,000 Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. Question Deadline 10/23/2024 very request for such interpretation should be in writing addressed Facilities, Sturbridge Town Hall, 308 Main Street, Sturbridge, MA 01566, and to be given consideration must be received at least seven (7) days prior to the date fixed for the opening of bids. Emails to Robyn Chrabascz, Facilities Manager, are acceptable for submitting requests to rchrabascz@sturbridge.gov General Scope shall include: o Administrative work required for a building permit (note the fee will be waived) o Submittals of materials to be used o Removal of all waste and cleanup of site o Removal of all shingles, underlayment, and drip edges or other accessories to be replaced o Installation of Certainteed Landmark Shingles, color to be Georgetown Gray or equal and provide warranty registration For the Cedar Recreation Bathhouse: o Inspect roof sheathing - no replacement is expected. Notify project manager if rotten areas are found. o Install 6-feet of ice and water shield across eaves and install underlayment for the remaining sheathing with new drip edge at entire perimeter of roof o Provide new boot and counterflashing at plumbing and electrical penetrations o Install ridge vent with matching ridge cap shingles. For Pavilion: o Inspect roof sheathing and replace rotten and damaged linear sheathing with new to match existing, 75 LF estimated; prime coat and finish to match all new material o Install 6-feet of ice and water shield across eaves and install underlayment for the remaining sheathing with new drip edge at entire perimeter of roof o Install peak cap with matching shingles o For sidewalls: Install new 1x8 composite trim board along outside of perimeter of sheathing at grade, replacing any rotted blocking/framing with new pressure treated blocking/framing. Re-fasten loose sheathing to existing framing with screws.

Post-Bid

Fitness / Rec Centers

$24,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
469
Active Projects
301
Bidding Soon
3,377
All Active Projects
1,572
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 30, 2024

November 29, 2024

img_map_placeholder

60 Cedar St, Sturbridge, MA


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.