BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a bridge / tunnel in Vassar, Manitoba. Completed plans call for site work for a bridge / tunnel.

Section I - Pth 12 Culvert Replacement (1.2km North of Buffalo Point Road) (Project Id No. C07318) Supply and Install One (1) Precast Concrete Culvert by Jacking Through Provincial Trunk Highway 12, 1.2km North of Buffalo Point Road, in the Rural Municipality of Piney. Section Ii - Buffalo Point Road Culvert Replacement (5.4km East of Pth 12) (Project Id No. C07332) Supply and Install One (1) Precast Concrete Culvert by Trenching, Including Removing the Existing Corrugated Steel Culvert, Through Buffalo Point Road, 5.4km East of Provincial Trunk Highway 12, in the Rural Municipality of Piney. Completion Model the Contract Will Be Assessed Liquidated Damages in Accordance With the Specification for Liquidated Damages - Completion Specified by Completion Date. Liquidated Damages the Work Must Be Completed by No Later Than March 31, 2025. Daily Liquidated Damages After This Specified Completion Date Will Be Charged to the Contractor at the Rate of Five Hundred ($500.00) Dollars Per Calendar Day Until the Work is Completed. Seasonal Shutdown Date the Seasonal Shutdown Date for This Project is N/a. Question Acceptance Deadline: 2024/10/28 12:00:00 PM CDT Award is subject to final approval Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.

Award

Bridges / Tunnels

$276,654.00

Public - State/Provincial

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
23
Active Projects
9
Bidding Soon
201
All Active Projects
57
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 30, 2024

December 2, 2024

img_map_placeholder

MB-12, Vassar, MB

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.