BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 8, 2025 at 8:00 PM

Updated July 9, 2025

Site work and paving for a bridge / tunnel in Chambers, Arizona. Conceptual plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

https://www.wmicentral.com/news/i-40-bridges-in-apache-county-set-for-major-safety-overhaul-with-27-5m-grant/article_ff52663e-b40e-11ef-b042-abc57edde94e.html The Window Rock and Lupton Traffic Interchange in Apache County will soon undergo safety and infrastructure upgrades, thanks to a $27.5 million federal grant provided through the Bipartisan Infrastructure Law. The funding, awarded under the Bridge Investment Program, will replace four outdated rigid-frame concrete bridges along Interstate 40, originally constructed in 1963. Senator Mark Kelly played a key role in shaping and delivering this investment for Arizona. As one of the architects of the Bipartisan Infrastructure Law, Kelly has consistently prioritized improving the state’s transportation infrastructure to enhance safety, create jobs, and support the local economy. “Arizona’s bridges connect our communities and support our economy — they need to be safe,” Kelly stated. “This investment to replace outdated bridges will enhance safety for drivers and residents while supporting trade and creating good-paying jobs. I’m proud to deliver resources through our Bipartisan Infrastructure Law to make projects like this possible.” Kelly’s advocacy ensured that the Bridge Investment Program became a cornerstone of the Bipartisan Infrastructure Law, allocating billions of dollars to address bridge replacements and upgrades across the United States. The program aims to reduce the number of bridges in poor condition and prevent those in fair condition from deteriorating further. ----------------------------- County : Apache Description : Bridge Rehabilitation Project Limits: I 40 Bridge 677 milepost 357.53 to 358.53 (1 mile), I 40 Bridge 678 milepost 357.53 to 358.53 (1mile), I 40 Bridge 680 milepost 359.21 to 360.21 (1 mile) Route : I 40 As of July 8 , 2025, the project is in Conceptual status. Anticipated letting Year is 2027. AZDOT - Window Rock TI OP EB/WB and Lupton TI OP EB/WB *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Bridges / Tunnels

$52,109,600.00

Public - State/Provincial

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
16
Active Projects
5
Bidding Soon
72
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.