BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 14, 2022 at 8:00 PM

Updated January 29, 2024

This is a service / maintenance or supply contract in Chambers, Arizona. Contact the soliciting agency for additional information.

Project Name: Apache Trail & Superstition Blvd Street Lighting Improvements Project (TRACS) Number: T0365 03D District: Central Route/MP: Apache Trail & Superstition Street: Meridian to SR88 Funding Source: HSIP Construction Funding FY: FY 2024 This is a Local Public Agency project sponsored by the City of Apache Junction. This project aims to improve street lighting along Apache Trail and Superstition Boulevard between Meridian Drive and SR88. All improvements to be completed in the City's Right-of-Way. The design consultant shall lead project development that will provide lighting improvements along Apache Trail from Palo Verde Drive to SR88 and along Superstition Boulevard from Meridian Drive to SR88. Stage submittals will consist of Stage III, IV and Final PS&E. The scope of work shall also include: - Review of available record drawings and field survey to be performed as needed - Perform necessary utility investigations, right-of-way determinations and NEPA documentation to obtain utility, rightof-way and environmental clearances. The consultant shall provide a bid package which includes plans, specifications and estimates for construction. The design consultant shall also provide necessary project management tasks including coordination, meetings, project schedule updates and comment responses. Document retention, project schedule, and risk register updates within the Workfront platform will be required. The scope will include the preparation of construction plans, technical specifications, cost estimates and related construction documents for safety improvements at the intersection. Questions, in writing, shall be received by ECS at the below email address until 3 BUSINESS DAYS BEFORE SOI DUE DATE at 2:00 P.M. (Arizona Time). No further questions shall be accepted after the time specified. The method of contractor selection has not been determined at this time. AZ DOT - RFQ - Project Development On-Call - Apache Trail and Superstition Blvd Street Lighting Improvements

Conceptual

Roads / Highways

Public - State/Provincial

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
15
Active Projects
5
Bidding Soon
72
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 20, 2023

Project location map

Meridian Drive and SR88, Chambers, AZ


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.