BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 30, 2024 at 7:00 PM

Updated January 1, 2025

Site work for a water / sewer project in Charlottetown, Prince Edward Island. Completed plans call for site work for a water / sewer project.

As of December 30, 2024, the project was awarded to Island Coastal Services Ltd, with an awarded amount of $528,620.71. The work takes place on the north side of the North River Causeway approximately 230 metres west of the intersection of Route 1 and Milky Way. The work proceeds for approximately 70 metres. The work includes: Removal and disposal of existing concrete planks, submarine excavation, excavation, removal of existing gravel, placing structural fill, placing gravel, installation of new precast concrete slabs, placement of R100 rip rap armourstone, installing environmental controls, and all other work necessary to complete the Contract. The Contractor agrees to complete the work on, or before February 28, 2025. The stipulated bid security amount shall be a minimum of $54,000.00 A bid bond equal to or greater than the amount stipulated in schedule a - schedule of special provisions. The bond shall be from a surety company authorized to carry on business in canada guaranteeing to supply a performance bond equal to 50% of the contract value, excluding hst and a labour and material bond equal to 25% of the contract value, excluding hst. a certified cheque in the minimum amount of ten percent (10%) of the Contract value, excluding HST, which shall be retained until the warranty period (one (1) year after substantial completion) has elapsed, or a bank draft in the minimum amount of ten percent (10%) of the Contract value, excluding HST, which shall be retained until the warranty period (one (1) year substantial completion) has elapsed, or a performance format irrevocable standby letter of credit on a government approved form in the minimum amount of ten percent ( 10% ) of the Contract value, excluding HST, which shall be retained until the warranty period (one (1) year after substantial completion) has elapsed. A performance standby letter of credit must have an automatic renewal clause within the body of the agreement, or a performance bond equal to 50% of the Contract value, excluding HST and a labour and materials bond equal to 25% of the Contract value, excluding HST both of which shall be retained until the warranty period (one (1) year after substantial completion) has elapsed. Tender documents are available electronically at: http://www.princeedwardisland.ca/en/tenders

Award

Water / Sewer

$528,621.00

Public - State/Provincial

Site Work

11

3

6

2

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
31
Active Projects
11
Bidding Soon
332
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 5, 2024

December 5, 2024

Project location map

Multiple Locations, Charlottetown, PE

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.