BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Site work and paving for a mixed-use development in Fort Worth, Texas. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

https://www.tdlr.texas.gov/TABS/Search/Project/TABS2025006115 Project Name: Lake Worth Trail - Phase 1C Project Number: TABS2025006115 Facility Name: Lake Worth Trail Location Address: 951 Cahoba Drive Fort Worth, TX 76135 Location County: Tarrant Start Date: 1/15/2025 Completion Date: 12/10/2025 Estimated Cost: $3,000,000 Type of Work: New Construction Type of Funds: This project involves public funds, public land, or is a Federally funded roadway project. Scope of Work: This project is a 19,500 lf concrete trail that runs just north of Lake Worth in northwest Fort Worth. Square Footage: 19,500 ft 2 ----------------------------------------------------------------------------------------------- The major work will consist of the (approximate) following: The Base bid will include the construction of apprx. 4,700 Lf of 10' wide concrete trail and sidewalks, related markings, and signage, trailheads through the north facing Trinity River valley slope in Camp Carter and adjacent roadways in the City of River Oaks. This base bid segment begins on the north end of Inspiration Ln in River Oaks and continues south along Nancy Ln, east on Amherst Ave, South on Yale Street, then west on Purdue Ave and South on Harvard St to where it enters Camp Carter Property. The Base Bid continues through Camp Carter to where the trail reaches the bottom of the of Trinity River valley at an existing gravel road nearby Anahuac Ave. Alternate 1 will include apprx. 486 LF of 10' wide compacted aggregate trail and fencing starting at the Camp Carter Private Drive south of the Trinity River heading north around their visitor's center, ending just north of Camp Carter property adjacent to Anahuac Ave. and the Trinity River. Questions Due Date: Nov 19th 2024, 5:00 PM CST Online Portal Intent to Bid Due Date: Nov 21st 2024, 2:00 PM CST

Post-Bid

Water / Sewer

$2,952,462.00

Public - City

Paving, Site Work

43

28

59

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
144
Active Projects
74
Bidding Soon
3,530
All Active Projects
1,288
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.