Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 28, 2026 at 8:00 PM

Updated October 4, 2026

Demolition, site work, paving and new construction of a civil project in Huachuca City, Arizona. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; and road / highway.

082 CH 061 Nogales - Tombstone Highway (SR 82) (San Pedro River Bridge Str No.) The proposed project is located in Cochise County on SR 82 between mileposts 61.12 and 61.32, west of Tombstone. The work consists of removing the existing San Pedro River Bridge and replacing it with a three span Precast Prestressed BT58 girder bridge. Additional work includes replacing existing guardrail, guardrail terminals, placing pavement markings and other miscellaneous work. SouthCent District Engineering Specialist: Rene Teran The time allowed for the completion of the work included in the construction phase of the contract will be 500 working days. The time allowed for the completion of the work included in the landscape establishment phase of the contract will be 730 calendar days. Question Deadline - 08/04/2026 - The Department May Not Answer All Questions, and Any Decision on Whether a Question is Answered Will Be Within the Sole Discretion of the Department. Any Questions Received Less Than Three Working Days Prior to The Bid Opening Date May Not Be Answered. The Application for Contractor Prequalification may be obtained from the Contracts and Specifications website. AZDOT - Capacity Additions (Major Bridge Rehabilitation) - SR 82

Award

Bridges / Tunnels

$10,463,304.00

Public - State/Provincial

Paving, Site Work

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
39
Active Projects
16
Bidding Soon
352
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 7, 2026

October 6, 2026

Project location map

AZ-82, Huachuca City, AZ

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed