BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and renovation of a water / sewer project in Houston, Texas. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

Owner: HCWCID No. 156 Location Harris County, TX Map Code: Show Google Map Open Map On Google Scope A. The work in this contract is for the Lift Station No. 1 Generator for Harris County Water Control and Improvement District No. 156 located in Clear Lake. The purpose of this project is to install a generator at the lift station site so that the lift station can continue to function in case the site loses power. B. In general, this work consists of: 1. Contractor shall acquire all permits and provide copies to LAN as a prerequisite to starting work. 2. Demolition of existing fence. 3. Installation of proposed chain link fencing and swing gate to accommodate new pad and generator as shown on plans. 4. Demolition of existing generator quick connect, main service breaker, manual transfer switch, conduits, and any appurtenances and items shown in specifications and plans. 5. Furnish and install a new natural gas emergency standby generator w/ sound attenuating enclosure, generator pad, testing, new automatic transfer switch (ats), 120/240 single phase panel, and all required equipment for a fully functional emergency generator system as described in plans and project manual. 6. Electrical service allowance for electrical service by local utility. Exact amount will be reimbursed to contractor upon submittal of invoice from electric utility. 7. Natural gas allowance for natural gas service by local utility. exact amount will be reimbursed to contractor upon submittal of invoice from natural gas utility. All new accounts shall be opened by contractor and transferred to owner upon substantial completion. 8. Site restoration. Contact Address Lockwood, Andrews, & Newnam Inc. 3700 W Sam Houston Pkwy S Houston, Texas 77042 Contact Info Contact: Lilly Boehler Phone: 346-440-1846 Fax: Email: lmboehler@lan-inc.com This project was designed by Lockwood, Andrews & Newnam, Inc. (LAN). The bidding and construction phase engineering services on this project will also be conducted by LAN. Any questions regarding the project should be directed to Lilly M. Boehler, E.I.T. or Suzanne L. Tank, P.E., with LAN at (713) 266-6900 Question Deadline 10/31/2024 Bidders desiring further information, or further interpretation of the Contract Documents, and Technical Specifications and Plans, must make request for such information in writing to the Engineer, prior to 3 business days before the Bid Opening.

Bid Results

Water / Sewer

$169,169.00

Public - County

Renovation, Site Work

17

12

6

Subscribe For Documents

36 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
115
Active Projects
59
Bidding Soon
2,732
All Active Projects
1,050
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.