Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 30, 2025 at 7:00 PM
Updated December 31, 2025
Site work, paving and new construction of a civil project in Tuba City, Arizona. Completed plans call for site work for a road / highway; for paving for a road / highway; bridge / tunnel; for the construction of a bridge / tunnel; and road / highway.
Project no-160 CN 321 F064401C 160-A(213)T Tuba City - Four Corners Hwy (Tuba City - MP 335) TUBA CITY-FOUR CORNERS (TUBA CITY-MP 335) The proposed project is located on Navajo Nation and Hopi lands in Coconino County begins at Tuba City and extends east along US 160 from Milepost 321.80 to Milepost 335. The proposed work consists of mill and replaces AC, remove and replace guardrail, extend pipe culverts, pavement marking and other related work. This project is located on a Native American Reservations, in the Navajo Nation and Hopi lands area, which may subject the contractor to the laws and regulations of the Navajo Nation and Hopi lands and its TERO office. Contractors are advised to make themselves aware of any taxes, fees or any conditions that may be imposed by the Navajo Nation and Hopi lands on work performed on the Reservations. NorthCent District Item # 103683 Engineering Specialist: Rene Teran Question Deadline 08/12/2025 The Department May Not Answer All Questions, and Any Decision on Whether a Question is Answered Will Be Within the Sole Discretion of the Department. Any Questions Received Less Than Three Working Days Prior to The Bid Opening Date May Not Be Answered. MILEPOST 321.8 to 335.0 The time allowed for the completion of the work included in the contract will be 140 working days. The minimum contract-specified goal for participation by Disadvantaged Business Enterprises in the work, as a percentage of the total amount bid, shall be 2.78 . . The Application for Contractor Prequalification may be obtained from the Contracts and Specifications website. A proposal guaranty in the form of either a certified or a cashier's check made payable to the State Treasurer of Arizona for not less than 10 percent of the amount of the bid or in the form of a surety (bid) bond for 10 percent of the amount of the bid shall accompany the proposal. AZDOT - System Preservation (Restoration/Rehab/Resurface) - US 160 MBE (20%), WBE (7%), DBE (3%) Letting ID - 0250919 Construction Start Date - April 2026.
Award
Roads / Highways
$20,475,888.00
Public - State/Provincial
New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 21, 2025
April 1, 2026
US-160, Tuba City, AZ
Related To This Project
Tuba City, AZ
Bid Date: Sep 25 2025
Tuba City, AZ
Bid Date: Aug 08 2025
Tuba City, AZ
Bid Date: Oct 06 2025
Tuba City, AZ
--
Tuba City, AZ
Bid Date: Oct 10 2025
Tuba City, AZ
Bid Date: Dec 02 2025
Tuba City, AZ
Bid Date: Nov 21 2025
Tuba City, AZ
Bid Date: Feb 12 2026
Tuba City, AZ
--
Tuba City, AZ
Bid Date: Apr 22 2025
Tuba City, AZ
Bid Date: Jun 24 2025
Tuba City, AZ
Bid Date: Dec 18 2025
Tuba City, AZ
Bid Date: Dec 27 2024
Tuba City, AZ
Bid Date: Apr 11 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
