BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 19, 2025 at 8:00 PM

Updated March 20, 2025

Demolition, site work, new construction and addition to a fire / police facility in Sealy, Texas. Working plans call for the demolition of a fire / police facility; for site work for a fire / police facility; and for the addition of a 1,800-square-foot fire / police facility.

**As of March 19, 2025, bids were canceled. No definite date for the rebid.** Sealy Fire Department will release the requirements for a structural addition (60x30') to its current station. The proposer shall provide their attainable project schedule in terms of weeks after contract. Such as, Project start - 2 weeks after award. Foundation complete - 6 weeks after award, etc. This document pertains to the expansion of Sealy Fire Station 1 only. No other past, current, or future projects are associated with this document. PDF STSM-16-SFD-GA-0100, separate from this document, includes engineering drawings and layouts of the expansion, and will be considered an integral attachment to this specification. The Sealy Fire Department is seeking to expand space for apparatus storage, file storge room, equipment and lawn care storage. These spaces will be incorporated into a building expansion to the south side of the existing fire station. The overall under-roof expansion footprint will be 58'-4" x 30'-0". A concrete driveway (approximately 2100 square feet) is also required as part of a proposal. This request does not include finishing the interior structure walls and doors for indicated rooms Submit any inquiries or clarifications in writing to the designated email address above. Inquiries and clarifications will be collected on a weekly basis and then replied to in writing. All inquiries and clarifications will be provided to all proposers. The site will be available for inspection by any proposer wishing to make a site visit. All site visits will be coordinated through the email address listed above.

Final Planning

Fire / Police

$220,000.00

Public - County

Addition, Demolition, New Construction, Site Work

15

8

2

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
408
Active Projects
233
Bidding Soon
3,396
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 6, 2025

September 19, 2025

Project location map

1207 Hwy 90 W, Sealy, TX


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.