BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a municipal facility in Martinez, California. Completed plans call for site work for a municipal facility.

General work description: The work to be done generally consists of removing 94 existing trash capture basket and crescent type devices and 9 connector pipe screens (CPS), installing 63 CPS, and 8 automatic retractable screens (ARS) and installing 2 deflector screens at four sites located in the unincorporated area of North Richmond, San Pablo, El Sobrante, Montalvin, Rodeo, Crockett, Pacheco, and Bay Point. Project will work on 115 catch basins in total, and includes cleaning debris from catch basins, and preparing a photo inventory of each installation. Number of Working Days: 60 You are required to subcontract a minimum of 13% of your bid in accordance with the Mandatory Subcontracting Minimum requirements within these special provisions. The Contractor must possess a valid Class A or Class C43 License at the time the Contract is awarded. All bidder questions/inquiries received before 12:00 p.m. the Thursday prior to the scheduled bid opening will be posted with their responses on the Public Works Web Site (www.cccounty.us/pwprojects). Questions received after this deadline will remain unanswered. The current planholders list can also be found at this website. For questions regarding the project contact Henry Hussey, Design/Construction Division, at 925.313.2338 or email henry.hussey@pw.cccounty.us The said Board reserves the right to reject any and all bids or any portion of any bid and/or waive any irregularity in any bid received. For questions regarding the project 11/14/2024 at 12:00 PM PT All bidder questions/inquiries received before the Thursday prior to the scheduled bid opening will be posted with their responses on the Public Works Web Site (www.cccounty.us/pwprojects). Questions received after this deadline will remain unanswered. The current planholders list can also be found at this website. For questions regarding the project contact Henry Hussey, Design/Construction Division, at 925.313.2338 or email henry.hussey@pw.cccounty.us

Bid Results

Municipal

$129,702.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

9

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
169
Active Projects
90
Bidding Soon
1,881
All Active Projects
790
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 19, 2024

March 24, 2025

img_map_placeholder

Multiple Locations, Martinez, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.