Published October 25, 2024 at 8:00 PM

Updated November 20, 2024

Site work and paving for a civil project in Everett, Massachusetts. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The overall project consists of the reconstruction of the existing Segment E bulkhead and wharf. The existing 165 LF creosote timber bulkhead will be replaced with a new 165 LF vertical steel sheet pile bulkhead along the entire water frontage. The sheet piles will be installed waterward of the existing bulkhead to avoid causing instability of the ground upland of the bulkhead if it is removed. The area behind the new bulkhead will be backfilled with gravel borrow fill material to encapsulate the existing bulkhead in place. In addition, in order to connect the new bulkhead to the existing bulkhead on the south end of the project, a steel sheet pile cut-off wall will be installed. Because the face of the replacement bulkhead is moving approximately 10 feet waterward, the existing outfall pipe needs to be extended to go through the new bulkhead. The existing timber wharf (piles and deck) will be removed in its entirety. This includes demolition of wharf and fender timber piles (12.75-inch diameter creosote timber piles and 12.75-inch diameter steel piles). The existing wharf will be replaced with a wharf consisting of 13 24-inch diameter steel pipe piles supporting steel pile caps, timber stringers, and a timber deck). There will also be 20 12.75-inch diameter steel fender piles installed to protect the wharf's edge. New overwater coverage is needed to fix a pinch point in the current pedestrian and commercial fishermen's access configuration. Additional work includes performing soil stabilizing rigid inclusions, building two new landscape beds with plantings and irrigation, site lighting, hardscapes restoration, and site furnishings. ESTIMATED COST: $4,000,000-4,500,000

Post-Bid

Roads / Highways

$4,500,000.00

Public - City

Paving, Site Work

73

7

2

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Execution and Closeout Requirements, Examination and Preparation, Execution, Erection, Cleaning and Waste Management, Site Maintenance
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 03 - Concrete

Division 03 - Concrete

Cast-in-Place Concrete, Specialty Placed Concrete, Concrete Curing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Ceilings, Acoustical Ceilings, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment, Parking Key and Card Control Units
Division 12 - Furnishings

Division 12 - Furnishings

Multiple Seating, Pews and Benches, Benches
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Instrumentation and Control for HVAC, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Erosion and Sedimentation Controls, Earthwork Methods, Soil Stabilization, Shotcrete Soil Slope Stabilization, Special Foundations and Load-Bearing Elements, Driven Piles, Bored Piles
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Watering, Bases, Ballasts, and Paving, Curbs and Gutters, Site Improvements, Retaining Walls, Planting, Turf and Grasses, Plugging, Plants, Shrubs, Trees
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection, Waterway Construction and Equipment, Waterway Scour Protection
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists, Cranes, Mobile Plant Equipment, Mobile Earth Moving Equipment, Excavators

Find More Local Projects

Within 75 Miles of This Project
255
Active Projects
150
Bidding Soon
2,721
All Active Projects
1,130
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 19, 2024

January 20, 2025

img_map_placeholder

Multiple Locations, Everett, MA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.