BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 28, 2025 at 7:00 PM

Updated January 29, 2025

Demolition, site work, paving and new construction of a mixed-use development in Maynard, Massachusetts. Completed plans call for the demolition of a educational facility; for the construction of a educational facility; for site work for a educational facility; playground / park / athletic field; for paving for a playground / park / athletic field; playground / park / athletic field; sidewalk / parking lot; and sidewalk / parking lot.

Contractor Qualification DCAMM Certificate Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. Question Deadline 01/08/2025 at 2:00 PM ET All bidding Requests for Information (RFIs) shall be submitted online Qualified General Contractors and Filed Subcontractors are invited to submit bids for the Green Meadow Elementary School project located at 5 Tiger Drive, Maynard, MA 01754. The project consists of a new two-story, 90,525+/- GSF school building for 395 students in grades K thru 3 with a Pre-K component for approximately 100 students. The new building will be constructed behind the owner-occupied existing building. Once the new building is occupiable, the existing building will be abated and demolished to make way for the additional site development, i.e. additional parking vehicular pathways, playground area, lawn area, etc. Construction is anticipated to begin March 2025 with a project duration of 28 months. Bid Result: Masonry : Fernandes Masonry, Inc - $3,435,000.00 Miscellaneous and Ornamental Metals : South Shore Welding, Inc. - $892,649.00 Waterproofing /Dampproofing / Caulking : Superior Caulking & Waterproofing Co., Inc - $751,000.00 Roofing and Flashing : Stanley Roofing Company - $2,502,000.00 Glass and Glazing: Kapiloff's Glass, Inc - $406,850.00 Tile : Jantile Boston, LLC - $618,168.00 Acoustical Tile : K&K Acoustical Ceilings, Inc - $384,000.00 Resilient Flooring : SELECT TILE MARBLE & FLOORING - $373,718.00 Painting : John W Egan Co., Inc - $243,200.00 Elevators: Delta Beckwith Elevator Company - $202,000.00 Fire Protection Sprinkler Systems: Johnson Controls Fire Protection LP - $614,500.00 Plumbing : Grasseschi Plumbing and Heating, Inc. - $2,463,000.00 Heating / Ventilating / Air Conditioning (HVAC) : Veterans Development Corporation, Inc - $7,537,000.00 Electrical Work : Wayne J. Griffin Electric, Inc - $6,720,000.00

Bid Results

Educational

$27,143,085.00

Public - City

Demolition, New Construction, Paving, Site Work

412

34

91

6

Subscribe For Documents

74 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
623
Active Projects
247
Bidding Soon
4,611
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 15, 2025

March 17, 2025

Project location map

5 Tiger Dr, Maynard, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.