BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 26, 2024 at 7:00 PM

Updated December 27, 2024

Renovation of a fire / police facility in Coachella, California. Completed plans call for the renovation of a fire / police facility.

Question Deadline 11/07/2024 at 5:00 PM PT Please send information to Brianna Greenwood Please send all formal Requests for Information (RFIs) to Brianna at bgreenwood@coachella.org It shall be the contractor's responsibility to provide and furnish all materials, tools, labor, and incidentals to complete the work as outlined in the Project Description and as shown in the Contract Documents for Fire Station #79 Garage Door Replacement Project, City Project No F-7 "Project". It shall be the Contractor's responsibility to thoroughly review the project area, familiarize himself with the scope of proposed work and submit the proposal for the work accordingly. 1.2 Project Description The project consists of providing: o Provide and install six (6) Speed Guardian 5000 LH U 42, or approved equal, high quality, high use insulated panel doors with appropriate seals and sensing edges of the dimensions as specified: [12'x12'] (exact measurements to be field verified) to include the rail, and spring assemblies at Fire Station #79 located at 1377 6 th Street, Coachella CA 92236. These doors need to be available in red color powder coat. The doors should also include a panel of windows or "lights" similar to existing doors. o The Contractor is responsible for evaluating, measuring, designing, and proposing garage door improvements as well as coordinating all equipment selection, ordering, sequence of construction, assembly and proper installation, as necessary for a fully functional, high quality, automated garage door system. o Provide and install an appropriately sized and powered operator for each door with a minimum of 2 HP. o Install new electrical wiring, switches, buttons, electrical appurtenances and new push button controls, as necessary at the three areas of the preexisting controls in the apparatus bay. Existing power supply is 120V. o Install new junction boxes for each new operator. o Eliminate and remove and abandoned wiring from existing operators and secure or remove junction boxes as needed. o Remove and dispose of existing doors and assemblies, and operators. o Install new breakers for the operators. o Make necessary adjustments to the doors and once completed test for safe and proper operation. o Ensure operation of the Fire Station is intact at all times during construction. o A minimum of ten programmed remote openers shall be provided with the longest available effective activation range

Award

Fire / Police

$267,000.00

Public - City

Renovation

5

6

5

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
255
Active Projects
129
Bidding Soon
1,432
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 19, 2024

December 19, 2024

Project location map

1377 6th St, Coachella, CA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.