BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 13, 2026 at 7:00 PM

Updated February 14, 2026

Renovation of a mixed-use development in Seattle, Washington. Working plans call for the renovation of a 9,200-square-foot medical facility; and laboratory facility.

*As of February 06, 2026, this design/build project is in preconstruction. Construction is expected to start in the Spring of 2026. UW Lab Medicine Roche Automation Upgrade Project Project Description: Project scope includes to replace clinical laboratory equipment that is end of life and install updated automation equipment within the lab at three locations: University of Washington Medical Center Montlake, University of Washington Medical Center Northwest and Harborview Medical Center. This project will require a phased approach to meet lab medicine validation needs that require current and new equipment to be run concurrently within the existing lab footprint for a minimum of 30 days. Once the new equipment is validated, it will need to be relocated to its final location. The design build team will be responsible for determining all infrastructure requirements to allow for concurrent operations as well as the final locations and installation of the automation equipment. The project will require detailed coordination with Roche, lab equipment vendor, as well as Lab Medicine and Operations and Maintenance personnel at all three facilities. Construction will occur concurrently at all three locations and the final schedule will be determined in partnership with Lab Medicine. The project budget is $ 7 million. The target budget for all work to be provided under the design-build contract is $4.6 million. Questions: All questions regarding this RFQ should be addressed to Tara Young, Project Manager, University of Washington Project Delivery Group, (206) 543-1961 or at twyoung@uw.edu.

Pre-Construction/Negotiated

Laboratories

$7,000,000.00

Public - State/Provincial

Renovation

4

3

2

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
63
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 18, 2025

March 23, 2026

Project location map

1959 NE Pacific St, Seattle, WA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.