BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a multi-residential development in St. John's, Newfoundland. Completed plans call for the renovation of a multi-residential development.

Closing Time: 12:00 PM (NT) ** Please note that there has been 1 addendum issued for this project. ** Question Acceptance Deadline 2024/10/31 03:00:00 PM NDT Boiler Gasket Replacement - 14-24 Buckmasters Circle, St. Johns 1.1 General Provide All Labour, Material, Plant, Equipment, Superintendence, Temporary Facilities, Permits and Administration to Perform the Work Outlined Below and Described in Greater Detail in the Specification and Drawings Attached Hereto and Forming Part of the Documents for This Project. Contractor is Responsible to Verify All Measurements on Site Prior to Start of Work. All Work is to Be Completed in Accordance With All Related Nl. Housing Specifications and Occupational Health and Safety Requirements. Project Description Work on This Project Includes, but is Not Limited to, Boiler Gasket Replacement-14-24 Buckmasters Circle, St. John's, Nl. 2 the Following Outline is General and is Not to Be Considered Complete in Every Detail. All Items to Be Supply and Install Unless Otherwise Noted. Contractor Responsible for Damage Caused During Construction. Before Submitting a Quote, Bidders Shall Carefully Examine the Contract Documents and the Site of the Proposed Work to Fully Inform Themselves of the Existing Conditions and Limitations. No Claim Will Be Entertained or Allowed for Any Labour, Materials or Other Extras That May Be Required for the Proper Execution and Completion of the Contract, Which Could Have Been Determined by Site Examination. 1.3 Outline of Work Remove Existing Gaskets From All Four (4) Sections of Smith Boiler. 2 Supply and Install New Gaskets for All Four (4) Sections of Smith Boiler Per Manufacturer's Instructions. 3 Contractor to Perform All Required Testing. Such as Hydro Test, to Ensure Boiler Fully Operational and No Leaks. Copy of Results to Be Submitted to Service Nl and Nlhc Representative Prior to Payment. Contractor to Fully Clean Any Areas Affected by Spills During Gasket Replacement as Per Specifications and Safety Regulations. Contractor Responsible for All Damages Incurred During Removal and Installation. Make Good All Affected Areas. 6 Contractor Responsible to Provide Work Schedule to Nlhc Representative and to Notify the Representative at Least Five (5) Days Prior to the Disconnecting of the Heating System. This is Required for Nl Housing to Prepare Proper Notice to Tenants. 6 if Contractor Requires Heating System to Be Disconnected for More Than 24 Hours to Complete Work Within Contract, Contractor is to Provide Portable Heaters and Domestic Hot Water for a Total of Six (6) Units Until Heating System is Back Online.. All Plumbing Work to Be Done by Certified Plumber and in Accordance With Current National Building Code of Canada and Current Plumbing Code of Canada. Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.

Post-Bid

Multi-Residential

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
14
Active Projects
9
Bidding Soon
116
All Active Projects
57
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 1, 2024

December 3, 2024

img_map_placeholder

24 Buckmasters Cir, St. John's, NL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.