Published October 28, 2024 at 8:00 PM

Updated October 1, 2024

Site work, paving and new construction of a fire / police facility in East Peoria, Illinois. Completed plans call for the construction of a 37,848-square-foot, two-story above grade fire / police facility; for site work for a fire / police facility; and for paving for a fire / police facility.

River City Construction, LLC has been selected to be the CM at Risk for this project. This building is a new 2- story, 37,848 sf building. The scope of work includes aggregate piers, concrete foundations, masonry veneer, interior & exterior CMU, structural steel framing, precast structural concrete, rough and finish carpentry, membrane roofing, waterproofing & air barrier, firestopping, metal composite panels, curtainwall & storefront, Doors/Frames/Hardware, ceramic tile, resilient flooring, tile carpeting, athletic flooring, detention equipment & controls, elevator, fire protection, plumbing, HVAC, electric, site utilities, site paving/hardscape, fencing, irrigation, retaining wall and landscaping. Bid Package 1 Final GMP Work Categories: - 3.1A Concrete Foundations, Flatwork & Waterproofing - 3.1B Precast Structural Concrete - 4.1 Masonry & Air Barrier - 5.1 Steel Fabrication & Erection - 6.1 General Works - 7.1A Metal Composite Wall Panels - 7.1B Roofing & Sheet Metal - 8.1 Glass & Glazing - 9.1A Drywall/Ceilings - 9.1B Flooring/Tile - 9.1C Painting - 11.1 Detention Equipment & Controls - 14.1 Elevators - 21.1 Fire Protection - 22.1 Plumbing - 23.1 Mechanical - 26.1 Electrical - 31.1A Earthwork, Excavation & Storm Utilities - 31.1B Rammed Aggregate Piers - 32.1A Landscaping - 32.1B Concrete Paving - 32.1C Fencing - 32.1D Irrigation - 32.1E Modular Block Retaining Wall - 33.1 Site Utilities - Water & Sanitary This is a construction management at risk project. THERE IS NO GENERAL CONTRACTOR. All Contractors on this Project are considered Trade Contractors to River City Construction (RCC). RCC will award separate All bids for individual Work Categories must be provided on the required Bid Form. If bidding on multiple bid packages, please submit a bid form for each individual work category. Bidders are allowed to submit combination bids of multiple bid packages. However, the bidder must also bid each package individually. The Owner reserves the right to accept or reject any Bid and to waive any irregularities in bidding. River City Construction, LLC is an Equal Opportunity Employer Questions for this Project shall be IN WRITING and directed to the Construction Manager at Risk: River City Construction, LLC., Attention Morganne Waller, email: mwaller@rccllc.com. **Total Project Estimate Value Listed

Post-Bid

Fire / Police

$14,400,000.00

Public - City

New Construction, Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Construction Progress Documentation, Photographic Documentation, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Assurance, Manufacturer Qualifications, Installer Qualifications, Mockups, Temporary Facilities and Controls, Temporary Utilities, Temporary Lighting, Temporary Construction, Vehicular Access and Parking, Temporary Roads, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Construction Layout, Execution, Application, Erection, Cutting and Patching, Cleaning and Waste Management, Progress Cleaning, Final Cleaning, Closeout Procedures, Closeout Submittals, Maintenance Data, Warranties, Project Record Documents, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Subsurface Investigation, Material Testing, Demolition, Selective Structure Demolition, Site Remediation, Chemical Decontamination
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Architectural Concrete, Concrete Finishing, Precast Concrete, Precast Structural Concrete, Grouting
Division 04 - Masonry

Division 04 - Masonry

Masonry, Common Work Results for Masonry, Unit Masonry, Clay Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Joists, Metal Decking, Steel Decking, Cold-Formed Metal Framing, Metal Fabrications, Metal Stairs, Metal Ladders, Metal Railings
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing, Underlayment, Gypsum Sheathing, Finish Carpentry, Architectural Woodwork, Plastic Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Dampproofing, Water Repellents, Thermal Protection, Thermal Insulation, Vapor Retarders, Air Barriers, Roofing and Siding Panels, Metal Wall Panels, Faced Panels, Membrane Roofing, Flashing and Sheet Metal, Sheet Metal Flashing and Trim, Roof and Wall Specialties and Accessories, Roof Specialties, Reglets, Roof Accessories, Fire and Smoke Protection, Firestopping, Fire-Resistant Joint Sealants, Joint Protection, Joint Sealants
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Hollow Metal Doors and Frames, Wood Doors, Specialty Doors and Frames, Access Doors and Panels, Access Doors and Frames, Coiling Doors and Grilles, Panel Doors, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Glazed Aluminum Curtain Walls, Windows, Aluminum Windows, Special Function Windows, Hardware, Door Hardware, Glazing, Glass Glazing, Mirrors, Louvers and Vents, Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Lath, Metal Lath, Gypsum Board, Tiling, Ceramic Tiling, Quarry Tiling, Ceilings, Acoustical Ceilings, Acoustical Panel Ceilings, Flooring, Flooring Treatment, Resilient Flooring, Static-Control Resilient Flooring, Fluid-Applied Flooring, Resinous Flooring, Carpeting, Access Flooring, Acoustic Treatment, Acoustic Wall Coating, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Visual Display Surfaces, Signage, Plaques, Dimensional Letter Signage, Interior Specialties, Compartments and Cubicles, Partitions, Wall and Door Protection, Toilet, Bath, and Laundry Accessories, Exterior Specialties, Protective Covers, Flagpoles
Division 11 - Equipment

Division 11 - Equipment

Commercial Equipment, Office Equipment, Computers, Educational and Scientific Equipment, Audio-Video Equipment, Entertainment Equipment, Athletic Equipment, Recreational Equipment, Healthcare Equipment, Examination and Treatment Equipment, Treatment Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Window Treatments, Furnishings and Accessories, Rugs and Mats, Runners, Furniture, Seating
Division 13 - Special Construction

Division 13 - Special Construction

Special Structures, Fabricated Engineered Structures
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Lifts, Scaffolding
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Fire Suppression, Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Piping and Pumps, Facility Storm Drainage, Roof Drains, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, HVAC Insulation, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Turning Vanes, HVAC Fans, Air Outlets and Inlets, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Unit Heaters, Humidity Control Equipment, Humidifiers
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Hangers and Supports for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Low-Voltage Switchgear, Switchboards and Panelboards, Switchboards, Panelboards, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies, Battery Equipment, Static Uninterruptible Power Supply, Electrical and Cathodic Protection, Facility Lightning Protection, Lighting, Interior Lighting, Special Purpose Lighting, Security Lighting, Exterior Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Special Foundations, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Paving Specialties, Pavement Markings, Site Improvements, Fences and Gates, Screening Devices, Irrigation, Planting, Turf and Grasses, Plugging, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Electrical Utilities, Site Grounding
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Cranes and Hoists, Cranes, Lifting Devices, Lifts, Mobile Plant Equipment, General Vehicles, Carts
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Liquid Handling Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
112
Active Projects
54
Bidding Soon
644
All Active Projects
381
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 14, 2024

December 19, 2024

img_map_placeholder

500 W Camp St, East Peoria, IL

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

East Peoria Police Station - Bid Package 1

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.