Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 7, 2025 at 7:00 PM
Updated February 20, 2025
Site work for a water / sewer project in Houston, Texas. Completed plans call for site work for a water / sewer project.
As of January 7, 2024, project was awarded to SER Construction Partners, LLC., awarded amount is $33,296,427.40. Project Name: Pine Trails Subdivision Drainage Improvements (Sections 1-2-5-6) - 2018 Project Number: TABS2025006266 Facility Name: Pine Trails Subdivision Location Address: East of Crosby Freeway and North of Wallisville Rd Houston, TX 77049 Location County: Harris Start Date: 1/6/2025 Completion Date: 2/1/2027 Estimated Cost: $2,735,900 Type of Work: Renovation/Alteration Type of Funds: This project involves public funds, public land, or is a Federally funded roadway project. Scope of Work: Approximately 36,000 SF of sidewalk and over 200 ramps. Square Footage: 3,600 ft 2 ---------------------------------------------------------- Drainage Improvements in the Pine Trails Subdivision Phase 1, 2, 5, 6 (2018) for Harris County Precinct 2 - UPIN 19101MF14202 Questions Due Date: Nov 1st 2024, 12:00 PM CDT The Pine Trails Subdivision Drainage Improvements Phase 1, Phase 2, Phase 5 and Phase 6 project site consists of subdivision drainage improvements and stormwater detention basins. Phases 1 and 2 are located on the Northwest and Southwest side of the Pine Trails subdivision respectively. Phases 1 and 2 include a proposed storm system and detention basin. The detention basin and storm sewer discharge into HCFCD Channel P109-01-01 at two different locations. Major work activities include off-site disposal of excavation, two stormwater detention basins and storm sewer improvements. The stormwater detention basin construction will consist of clearing and grubbing the site, installation of concrete pilot channels, backslope swales, interceptor structures, emergency overflow weirs, maintenance access roads and outfall structures. Phases 1 and 2 will include installation of storm sewer trunk lines and storm inlets, concrete street reconstruction, replacement of concrete sidewalk, and concrete driveway replacement. The project will also consist of utility adjustments such as water line offset adjustments, water line service adjustments, sanitary sewer main reconstruction, and sanitary sewer service adjustments. Utility adjustments will be constructed in coordination with AquaTX. Phases 5 and 6 are located on the Southeast and Northeast side of the subdivision respectively. These phases only include roadway reconstruction, sidewalk replacement, concrete driveway replacement and inlet/storm sewer lead replacement. Question Deadline 11/01/2024 at 12:00 PM CT Online Portal HARRIS COUNTY FLOOD CONTROL PROJECT NO. 230711044
Award
Water / Sewer
$33,296,427.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 11, 2024
January 1, 2025
Multiple Locations, Houston, TX
Related To This Project
Houston, TX
Bid Date: Oct 29 2024
Houston, TX
--
Houston, TX
--
Houston, TX
Bid Date: Nov 11 2021
Houston, TX
Bid Date: May 28 2020
Houston, TX
--
Houston, TX
Bid Date: Oct 22 2024
Houston, TX
Bid Date: Nov 18 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
