EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 12, 2024 at 7:00 PM

Updated October 1, 2024

Site work for a playground / park / athletic field in Sharon Hill, Pennsylvania. Completed plans call for site work for a playground / park / athletic field.

Lincoln Park Playground Improvements. File No. 81675-125 -23 The bids must be submitted on the annexed Form of Proposal and must be accompanied by certified good faith check or a corporate bid bond (no cash, bank or cashier's check will be acceptable) in the amount of ten percent (10%) of the bid, made payable to Darby Township, which check of proceeds thereof will be retained by the Township as Liquidated Damages if the successful bidder shall fail to execute a contract and bond as set forth in the annexed Proposal, Specifications and General Conditions. Attention of bidders is called to all of the requirements contained in this bid packet, particularly to the Federal Labor Standards Provisions, Davis-Bacon and Related Acts, Public Works Employment Verification, Section 3 of the Housing & Community Development Act, various insurance requirements, Central Contractors Registration, various equal opportunity provisions, the requirement for a payment bond and performance bond for 100% of the contract price and a oneyear maintenance bond for 10% of the contract price. Darby Township reserves the right to reject any and all bids, or parts thereof, and the right to waive any technicalities which they deem are in the best interest of the Township.

Bid Results

Playgrounds / Parks / Athletic Fields

$208,075.00

Public - City

Site Work

4

11

2

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation, Execution, Erection, Closeout Submittals, Bonds
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Reinforcing, Welded Wire Fabric Reinforcing, Cast-in-Place Concrete
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Structural Plastics, Structural Plastic Shapes and Plates, Plastic Lumber
Division 08 - Openings

Division 08 - Openings

Hardware
Division 11 - Equipment

Division 11 - Equipment

Entertainment Equipment, Play Field Equipment and Structures, Play Structures
Division 12 - Furnishings

Division 12 - Furnishings

Multiple Seating, Pews and Benches, Benches
Division 27 - Communications

Division 27 - Communications

Voice Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Excavation, Backfill, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Site Improvements, Fences and Gates, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding, Plants, Shrubs, Trees
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment

Find More Local Projects

Within 75 Miles of This Project
420
Active Projects
234
Bidding Soon
3,837
All Active Projects
1,682
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 6, 2024

December 6, 2024

img_map_placeholder

1032 Orange Ave, Sharon Hill, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Lincoln Park Playground Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.