BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and renovation of a mixed-use development in Rutland, Vermont. Completed plans call for the renovation of a office development; for site work for a office development; water / sewer project; and water / sewer project.

QUESTIONS DUE BY: November 21, 2024, at 4:30 PM (EDT) Any bidder requiring clarification of any section of this RFP or wishing to comment on any requirement of the RFP must submit specific questions in writing no later than the deadline for question indicated on the first page of this RFP. Questions may be e-mailed to the point of contact on the front page of this RFP. Questions or comments not raised in writing on or before the last day of the question period are thereafter waived. At the close of the question period a copy of all questions or comments and the State's responses will be posted on the State's web site Every effort will be made to post this information as soon as possible after the question period ends, contingent on the number and complexity of the questions. SCOPE AND BACKGROUND: Through this Request for Proposal (RFP) the Department of Buildings and General Services (hereinafter the "State") is seeking to establish a contract with a construction management firm to provide Construction Management services (hereinafter the "CM") for the Asa Bloomer Structural, Roofing, and Sewage System Upgrades Project. The primary objective of this project is to address critical infrastructure needs through comprehensive renovations. The roof and skylight has reached the end of its service life and is currently causing significant damage due to its compromised integrity. Concurrently, essential upgrades to the outdated sewer system, which is experiencing widespread failure and is no longer capable of meeting the buildings operational demands, are required. These crucial improvements are imperative to maintaining the structural integrity, operational efficiency, and overall safety of the building. CONTRACT PERIOD: The period of performance under this contract shall commence on January 06, 2025. See Section 5 Project Schedule for specific proposed dates. SINGLE POINT OF CONTACT: All communications concerning this RFP are to be addressed in writing to the State Contact listed on the front page of this RFP. Actual or attempted contact with any other individual from the State concerning this RFP is strictly prohibited and may result in disqualification. . FUNDING SOURCE: This project is being funded using Vermont Capital Construction Act funds, in whole or in part, through the State's capital construction act(s) and shall require compliance with the Vermont Prevailing Wage Rate requirements. A complete list of occupations and associated wage rates are available on the internet online The project is anticipated to begin as soon as this Contract is awarded with a preconstruction start date of approximately January 6,2025, with a single Preconstruction phase ending March 3, 2025, and a Substantial Completion date on or before September 28, 2026. Final project schedule, sequences and milestones will be determined by the State Project Manager, Architect, and the Construction Manager. The contractor shall reflect a total of 15 months of General Conditions on the enclosed Project Cost Matrix. The method of Contractor Selection has not been Determined at this time.

GC Bidding

Office

$5,500,000.00

Public - State/Provincial

Renovation, Site Work

32

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
109
Active Projects
42
Bidding Soon
878
All Active Projects
388
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 5, 2024

June 2, 2025

img_map_placeholder

88 Merchants Row, Rutland, VT

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.