Site work and paving for a road / highway in Myerstown, Pennsylvania. Completed plans call for site work for a road / highway; and for paving for a road / highway.

2025 Roadway Project. Question Deadline 11/01/2024 at 12:00 PM ET Questions Received After Only Those Questions Submitted Online Be Considered. Regarding the Project Will Not Be Acknowledged. The Contract Work Will Include, but Not Necessarily Be Limited to, Approximately 11,280 Sy Milling, 11,280 Sy Bituminous Seal Coat (Double Application) and Other Work Described in the Contract. A Certified Check or Bid Bond for the Amount of 10 Percent of the Total Bid Shall Be Required. Bonds Are to Be Issued by a Surety Licensed to Do Business in the Commonwealth of Pennsylvania. This Contract is Subject to the Following: the Pennsylvania Prevailing Wage Act Conditions; the Federal Occupational Safety and Health Act of 1970 (Osha) Conditions; the Pennsylvania Act 229 of 2002; the Pennsylvania One Call Act, Also Known as the Underground Utility Line Protection Law, Act 287 of 1974, as Amended; the Pennsylvania Human Relations Act 222 Condition; Requirement of a Noncollusion Affidavit; the Non-discrimination in Employment/contract Compliance Regulations Conditions; and the Public Works Employment Verification Act. Myerstown Borough Council Reserves the Right to Accept or Reject Any or All Bids. Michael Mckenna Borough Manager Project Identification: The Contract work will include, but not necessarily be limited to, approximately 11,280 SY milling, 11,280 SY bituminous seal coat (double application) and other work described in the contract. 1. 2. Project location: Norwedge Lane: Lincoln Ave. (SR 422) to Jefferson Ave. Rec Place: Norwedge Ln to Park Ln. Park Lane: Lincoln Ave. (SR 422) to Jefferson Ave. Walnut Alley: Washington Ave. to Monroe Alley Madison Alley: Cherry St. to past Chestnut Alley Chestnut Alley: Madison Alley to Carpenter Ave. Madison Alley: Railroad St. to College St. (SR 501) New Alley: Madison Alley to Carpenter Ave. Spring Alley: Railroad St. to Spruce Alley Walnut Alley: Carpenter Ave. to Bahney Ave. Walnut Alley: Bahney Ave. to Park Ave. Spruce Alley: Railroad St. to Cherry St. Chestnut Alley: Bahney Ave. to Park Ave. Walnut Alley: Muth Ave. to Mulberry Ave. Mulberry Alley: Railroad St. to Cherry St. Hershey Alley: New Alley to Peach Alley New Alley: Park Ave. to Maple Ave. New Alley: Maple Ave. to Center Ave. Peach Alley: Maple Ave. to Center Ave. Doe Alley: Carpenter Ave. to Spring Alley Spring Alley: Doe Alley to Plum Alley Plum Alley: Carpenter Ave. to Spring Alley Baum Street: Washington Ave. to Union Alley OWNER: Myerstown Borough, 101 South Railroad Street, Myerstown, PA 17067 This project shall include furnishing all labor, equipment, material, and appurtenances to complete all work in accordance with the Contract Documents. The work will include, but not necessarily be limited to, the following, as identically numbered in the UNIT PRICE SCHEDULE: 1. Mobilization and Demobilization (1 LS) 2. 3. 4. 5. 6. C. Traffic Control (1 LS) Milling - mill in place existing bituminous surface, 2" average depth, grade and compact, complete in place (11,280 SY) PA 2A Crushed Aggregate Leveling course, where directed, complete in place (690 TON) Bituminous Prime Coat (4,512 GAL) Bituminous Seal Coat (Double Application) (11,280 SY) CONTRACTS 1. Project will be constructed under a general construction contract.. 1.3 MISCELLANEOUS PROVISIONS A. B. C. D. E. F. Unless otherwise noted, all construction shall conform to Pennsylvania Department of Transportation (PennDOT) Publication 408, latest revision. Traffic control shall be in accordance with PennDOT Publication 213. The Contractor shall notify the Owner and Engineer five (5) days prior to the start of work. Bids shall remain open for a period of 60 days from the date of Bid opening. Bids may not be withdrawn during this period. All Bidders must bid on all items listed on the Bid Form and on each bidding alternative. The successful Bidder shall be required to furnish performance and payment bonds in the amount of 100 percent of the Contract Price. Contractor responsible for maintenance of milled surface. In addition to completing the online bid form, electronic files containing the required Bid Documents must be uploaded to the PennBID website. It is the Contractor's responsibility to verify that the bid form data has been entered properly and the entire document with all the required pages has been uploaded properly. Bids without the required Bid Documents may be rejected as incomplete. These documents can be found in the Contract Documents and in the folder "Documents to be Submitted Electronically with Bid." These must include: 1. 2. 3. 4. 5. 6. G. Anti-Collusion Affidavit Electronic Copy of Bid Security Bond Proposal & Contract Attachment 1A Special Provisions Worker's Compensation Affidavit Public Works Verification Form Notice is hereby given that a portion of the Project is being federally funded through the Coronavirus State Fiscal Recovery Fund and the Coronavirus Local Fiscal Recovery Plan established under the American Rescue Plan Act. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Bid Results

Roads / Highways

$157,152.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

13

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
197
Active Projects
81
Bidding Soon
1,782
All Active Projects
819
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 5, 2024

December 5, 2024

img_map_placeholder

Multiple Locations, Myerstown, PA

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.