Published May 14, 2025 at 8:00 PM
Updated June 17, 2025
Site work for a mixed-use development in Kingsville, Texas. Completed plans call for site work for a educational facility; and water / sewer project.
This specification shall govern all work necessary for clearing, grubbing and stripping of objectionable matter as required to complete the project, and shall include removing and disposing of trees, stumps, brush, roots, vegetation, rubbish and other objectionable matter from the project site. The deadline to ask questions is 5/09/2025 2:00 PM CST Project Summary: The Earthwork contractor shall make several site work adjustments to keep water from entering the high school's crawlspace. The contractor will also take corrective measures for building and site damage due to water and moisture damage. A performance bond will be required for all contracts over $100,000.00, and a payment bond will be required for all contracts over $25,000.00. A separate maintenance bond may be required for contracts under $100,000.00. Otherwise, it is included with the performance bond. Payment bonds are to be for 100% of the contract price. Bid Security must accompany each bid in the amount of ten percent (10%) of the largest possible total of the bid submitted. REQUEST FOR PROPOSALS (RFP 2025-003) FOR THE KINGSVILLE ISD H.M. KING HS DRAINAGE IMPROVEMENTS Estimate: $1,100,000 Base Bid Work (refer to the drawings and specs) Extend all roof drains and downspouts underground to the parking lots Extend the height of each building area-way vents Remove and elevate the mow strip Rough and finish grade for positive slope away from the building Landscape and sod Repair/replace the irrigation system Allowances: Using unit price, remove all insulation complete under the high school elevated slab (refer to technical specifications). Using unit prices, remove and replace damaged clevis pipe and conduit hangers in the crawlspace (see drawings and technical specifications) Owner's contingency allowance Add Alternates Installation of Johns Manville Corbond Open-Cell Spray Polyurethane Foam Insulation (2-inch Min. Thickness) to the underside of the high school elevated slab HDPE liner material and installation as identified in the drawings Under slab/crawlspace drainage improvements as identified in the drawings
Post-Bid
Educational
$1,100,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 13, 2025
July 11, 2025
2210 Brahma Blvd, Kingsville, TX
Related To This Project
Kingsville, TX
Bid Date: Feb 11 2025
Kingsville, TX
Bid Date: Dec 10 2024
Kingsville, TX
Bid Date: Dec 10 2024
Kingsville, TX
Bid Date: Jan 27 2025
Kingsville, TX
Bid Date: Jul 08 2025
Kingsville, TX
Bid Date: Mar 28 2025
Kingsville, TX
Bid Date: May 20 2025
Kingsville, TX
--
Kingsville, TX
Bid Date: Nov 19 2024
Kingsville, TX
Bid Date: Nov 19 2024
Kingsville, TX
--
Kingsville, TX
--
Kingsville, TX
Bid Date: Oct 15 2024
Kingsville, TX
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.