BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, renovation and addition to a mixed-use development in Sumner, Iowa. Completed plans call for the renovation of a educational facility; for the addition of a educational facility; for the demolition of a educational facility; and for site work for a educational facility.

o The proposed work will include improvements to the existing High School and the existing Middle School, which will continue to be used by the district in some format. o The proposed work could include remodeling one or both existing elementary schools. o The proposed work could include the closing and demolition of one or both existing elementary schools. o The proposed work could include the addition of space onto the existing Middle School building. o The proposed work could include the addition of space onto or near the existing High School building. o Each community is expected to retain a younger student center within their city. Duration of the work: The work may be delivered as one project after the passing of a bond referendum (Fall, 2026 through Fall, 2028) or may be completed in two phases (Phase 1: Spring, 2026 through Fall, 2027; Phase 2: Fall, 2026 through Fall, 2028). Location(s): Durant Elementary: 601 West 5th St - Sumner, IA 50674 Fredericksburg Elementary: 401 East High St - Fredericksburg, IA 50630 Middle School: 300 East Main St - Fredericksburg, IA 50630 High School: 802 West 6th St - Sumner, IA 50674 Ranking Evaluation Complete / Tentative Contract Award by District Board 01/13/2025 Please direct all questions to - Owner: Kevin Seney, Superintendent Sumner-Fredericksburg Schools 802 West Sixth St, Sumner, lowa 563.578.3341 seneyk@sfcougars.k12.ia.us. Nick Hildebrandt, Principal Architect Emergent Architecture 100 E 2nd St, Ste 204, Cedar Falls, lowa 319.529.3534 nick@emergentarch.com Approximate value: Total project construction value of approximately $24-25M *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Question Deadline 11/13/2024 All questions submitted will be compiled and addressed. Owner's Representative Kevin Seney - Superintendent Sumner-Fredericksburg Schools seneyk@sfcougars.k12.ia.us Design Team Representative: Nick Hildebrandt - Principal Architect Emergent Architecture nick@emergentarch.com 319.529.3534 12/11/2024 RFP Questions Due

GC Bidding

Educational

$25,000,000.00

Public - State/Provincial

Addition, Demolition, Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
42
Active Projects
23
Bidding Soon
369
All Active Projects
147
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 20, 2024

January 14, 2025

img_map_placeholder

Multiple Locations, Sumner, IA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.