Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 14, 2025 at 7:00 PM

Updated January 15, 2025

Demolition, site work, new construction and renovation of a mixed-use development in Huntsville, Alabama. Completed plans call for the demolition of a educational facility; for the construction of a educational facility; for the renovation of a educational facility; for site work for a educational facility; pre-engineered storage facility; pre-engineered storage facility; and pre-engineered storage facility.

The project is to include demolition of an existing gym building and canopy and construction of a pre-engineered metal building with a structural CMU wall base. The building exterior consists of a brick water table and insulated metal roof and wall panels. A 3-hour fire rated wall separates the existing school from the new gymnasium. A cashier's check or bid bond payable to Huntsville City Schools in an amount not less than five (5) percent of the amount of the bid, but in no event more than $10,000, must accompany the bidder's proposal. Performance and Payment Bonds and evidence of insurance required in the bid documents will be required at the signing of the Contract. The Owner reserves the right to reject any or all proposals and to waive technical errors if, in the Owner's judgement, the best interests of the Owner will thereby be promoted.

Bid Results

Educational

$1,752,000.00

Public - City

Demolition, New Construction, Renovation, Site Work

55

26

20

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
77
Active Projects
34
Bidding Soon
827
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 12, 2024

December 12, 2024

Project location map

2500 Barney Terrace NW, Huntsville, AL

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed