BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 26, 2024 at 7:00 PM

Updated November 27, 2024

Site work and paving for a mixed-use development in Dubuque, Iowa. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

This project provides for the installation of approximately 300 feet of 8-inch diameter sewer along Broadway Street, from Putnam Street to W. 28th Street. On multiple occasions, the existing sewer system has surcharged so that wastewater has back flowed into basements. The sewer is proposed to be redirected so that flows are conveyed with a greater capacity to mitigate the recurring backups. During design, staff identified several deficiencies with the roadway, sidewalk, curb and gutter, which will also be addressed within the project limits. All work shall be performed in accordance with the Iowa Statewide Urban Design and Specifications (SUDAS), 2023 Edition, and the City Supplemental Specifications, 2023 Edition. There is no Pre-Bid meeting for this Project. Each Bidder must accompany its Bid with a Bid security as security that the successful Bidder will enter into a contract for the work Bid upon and will furnish after the award of contract a corporate surety Bond, acceptable to the governmental entity, for the faithful performance of the contract, in an amount equal to one hundred percent of the amount of the contract. The Bid security must be in the amount of ten percent (10%) of the amount of the contract and must be in the form of a cashier's check or certified check drawn on a state-chartered or federally chartered bank, or a certified share draft drawn on a statechartered or federally chartered credit union, or the Bidder may provide a Bid Bond with corporate surety satisfactory to the governmental entity. The Bid Bond must contain no conditions except as provided in this section. Work on the Project must be commenced within ten (10) calendar days after the Notice to Proceed has been issued and shall be fully completed by August 1, 2025. Per ARPA, Contractors must comply with requirements which are included in this specification, including provisions for: domestic preferences for procurement; contract work hours and safety standards; anti-lobbying; compliance with Clean Air Act and Federal Water Pollution Control Act; equal employment opportunity; contracting with small and minority businesses, women's business enterprises, and labor surplus area firms; suspension and debarment; System for Award Management; and procurement of recovered materials. The City of Dubuque, Iowa, reserves the right to reject any and all Bids.

Award

Water / Sewer

$266,668.00

Public - City

Paving, Site Work

18

8

2

4

Subscribe For Documents

40 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
158
Active Projects
94
Bidding Soon
1,164
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 7, 2024

December 9, 2024

Project location map

Broadway St, Dubuque, IA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.