BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 9, 2024 at 7:00 PM

Updated December 10, 2024

Demolition, site work, renovation and addition to a transportation facility in Orlando, Florida. Completed plans call for the addition of a transportation facility; for the demolition of a transportation facility; for the renovation of a transportation facility; and for site work for a transportation facility.

The scope of services includes all design and construction for fully functioning restroom facilities consistent with the Design Criteria Package, including, but are not limited to, preparation of design documents, development of design alternatives, architectural design, structural, mechanical and electrical engineering design, finishes design, selection of materials, analysis of life cycle costs, permitting, evaluation and documentation of existing conditions, verification of as-built conditions, cost estimating and scheduling, demolition, material procurement, construction, quality control, testing, commissioning, turnover to operations and all other services necessary for fully functioning facilities, including coordination with the Aviation Authority, its Consultants, the City of Orlando, and all agencies having jurisdiction over the Project. This Project is to update and refurbish all public restrooms at Airsides 1, 2, 3 and 4 at MCO. The scope of services includes all design and construction for fully functioning restroom facilities consistent with the Design Criteria Package, including, but are not limited to, preparation of design documents, development of design alternatives, architectural design, structural, mechanical and electrical engineering design, finishes design, selection of materials, analysis of life cycle costs, permitting, evaluation and documentation of existing conditions, verification of as-built conditions, cost estimating and scheduling, demolition, material procurement, construction, quality control, testing, commissioning, turnover to operations and all other services necessary for fully functioning facilities, including coordination with the Aviation Authority, its Consultants, the City of Orlando, and all agencies having jurisdiction over the Project. Question Submission Deadline:November 5, 2024, 4:00pm We will be shortlisting the respondents tomorrow, 12/10/24 following our Construction Committee meeting at 9AM EST. Carl T. Langford Board Room, 1 Jeff Fuqua Blvd. Orlando International Airport, Orlando, FL 32827.

Post-Bid

Transportation Terminals

$2,000,000.00

Public - City

Addition, Demolition, Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

19

Subscribe For Documents

34 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
67
Active Projects
1
Bidding Soon
1,306
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 21, 2024

March 5, 2025

Project location map

1 Jeff Fuqua Blvd, Orlando, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.