Published September 22, 2025 at 8:00 PM

Updated September 23, 2025

Demolition, site work and addition to an educational facility in Charleston, South Carolina. Completed plans call for the addition of a 103,000-square-foot, two-story above grade educational facility; for the demolition of a educational facility; and for site work for a educational facility.

*As of September 15, 2025, a general contractor has already been awarded for this project back in May 2025, and is currently under construction. Construction started on May 1st, 2025 and is expected to be completed in August 2027. The work includes, but is not limited to, the construction of a new, two-story, fully sprinkled, 103,000 square foot building addition located on the existing C.E. Williams Middle School North Campus. Location- 1776 William Kennerty Drive Charleston, SC 29407 This is a pre-qualified bid only open to contractors who have received notice. The first day the contractor will have access to the site will be February 3, 2025. Building Substantial Completion by November 13, 2026. Project Substantial Completion by July 1, 2027. The Owner has retained the services of a Program Manager to represent the Owner's interest during the construction of the work. The work includes, but is not limited to, the construction of a new, two-story, fully sprinkled, 103,000 square foot building addition located on the existing C.E. Williams Middle School North Campus (1776 William Kennerty Drive, Charleston, SC 29407). The facility will be composed predominantly of load bearing masonry veneered with utility brick and reinforced with structural steel, joists, trusses, and metal decking. The roof system is a 2-ply modified bitumen system. Mechanical system is an air-to-air direct expansion system with dedicated outdoor air units. Finishes will include but are not limited to: SVT, ceramic and quarry tile, sealed concrete flooring, carpet, acoustical ceilings, paint, casework, marker/tack boards, and kitchen equipment. The package includes an elevator, basic electrical services, life safety systems, information technology systems, and cable trays. Sitework is also part of this contract and consists of demolition of the existing building, the installation of utilities, paving, sidewalks, curb & gutter, fencing, grassing and landscaping. Project will be required to be designed and constructed in accordance with CCSD's Educational Specifications and Design Requirements. MBE (10%) Question Deadline 01/09/2025 at 3:00 PM ET via above e-mail to lawrence_lutrario@charleston.k12.sc.us

Under Construction

Educational

$58,000,000.00

Public - County

Addition, Demolition, Site Work

357

33

127

4

Subscribe For Documents

37 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
28
Active Projects
2
Bidding Soon
439
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 28, 2025

July 1, 2025

Project location map

1776 William Kennerty Dr, Charleston, SC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.