Site work and paving for a mixed-use development in Midland, Michigan. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

**As of January 09, 2025, project was awarded to Crawford Contracting, Inc. awarded amount is $3,273,452.90.** Reference Number 0000366468 the street reconstruction and water main installation on Jefferson Ave. from Lyon Rd. to the Ashman Circle. Some of the quantities listed in the Itemized Bid are as follows: 5,190 Lft 10" PVC C909 Water Main (Pressure Class 235) 4,730 Ton Bit. Pavement 9,950 Lft Concrete Curb & Gutter (F-4) 1,490 Lft Concrete Curb & Gutter M-Opening (F-4) General Requirements - Bid Deposit Required - Insurance Required Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Payment Bond 100 % -- A certified check or bid bond for a sum of not less than five percent (5%) of the amount of the Proposal will be required with each bid. *The City reserves the right to accept or reject any or all bids, to waive irregularities or defects, and may accept other than the low bid when deemed in the City's best interest. This project is for the street reconstruction and water main installation on Jefferson Ave. from Lyon Rd. to Ashman Circle. The project scope includes, but is not limited to crushing & shaping of bituminous pavement, storm sewer modifications, removal/replacement of concrete curb and driveway approaches & placement of new bituminous pavement and installation of water main. In general, the order of construction activities shall be as follows: 1. Crush & shape existing bituminous pavement and aggregate base. 2. Install water main. Disinfection and pressure testing of new water main by the City of Midland Water Department. 3. Complete service transfers and tie-ins (by the City of Midland Water Department and Contractor). 4. Complete storm sewer modifications. 5. Replace curb & gutter, driveway approaches and sidewalk ramps. Complete all concrete work on one side of the street and reopen to residents prior to beginning concrete work on the other side. 6. Cut the grade to accommodate the design pavement thickness and regrade structures in street, including replacement of castings. 7. Fine grade and compact aggregate base. 8. Place bituminous pavement. 9. Establish turf

Award

Roads / Highways

$3,273,453.00

Public - City

Paving, Site Work

9

6

5

Subscribe For Documents

59 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
224
Active Projects
110
Bidding Soon
1,252
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 19, 2024

May 5, 2025

Project location map

Jefferson Ave, Midland, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.