Site work and paving for a road / highway in Carthage, North Carolina. Completed plans call for site work for a road / highway; and for paving for a road / highway.

1 Section of Us-1, 2 Sections of Nc-24, 2 Sections of Nc-690, and 8 Sections of Secondary Roads. Contract Id C204997 WBS: 2025CPT.08.03.10631 County: Moore Length: 29.675 MI DBE Goal 6.00% Job Type: Milling, Resurfacing, and Shoulder Reconstruction A Bid Bond or Bid Deposit in the Amount of 5% of the Total Amount Bid Will Be Required. The Bidder Shall Submit an Electronic Bid Bond With Each Electronic Bid Submittal Unless They Elect to Furnish a Bid Deposit. All Questions Related to Projects During the Advertisement Period Shall Be Emailed to the State Contract Officer at Contractofficer@ncdot.gov. The Minimum Wage for Labor Will Be Shown in the Proposal Form for Federal Aid Projects. Contractor's License: a General Contractor's License Is Required in Order to Submit a Bid on Any Non-federal Aid Project Where the Bid Is $30,000.00 or More, Except for Certain Specialty Work as Determined by the Licensing Board. On Federal Projects, the Appropriate Contractor's License Shall Be Obtained Within 60 Days of Bid Opening. For Additional Information or to Make Application for a License, Visit the Contractor Licensing Board Prequalifying to Bid: All Prospective Bidders Shall Be Prequalified With the Department of Transportation Prior to Submitting a Bid. Contractors Who Are Not Prequalified May Obtain Information and Forms for Prequalifying From the Prequalification Section of the Contract Standards and Development Unit at Online All Required Prequalification Statements and Documents Shall Be Filed With the Contractual Services Management Section at Least Four Weeks Prior to the Date of Opening Bids. The Department of Transportation Hereby Notifies All Bidders That It Will Affirmatively Ensure That in Any Contract Entered Into Pursuant to This Invitation to Bid, Minority Business Enterprises Will Be Afforded Full Opportunity to Submit Bids in Response to This Invitation and Will Not Be Discriminated Against on the Grounds of Race, Color, Sex, or National Origin in Compensation to This Award. Completion date : Oct 01, 2026 The Right Is Reserved to Reject Any or All Bids. NCDOT - 010 - Milling, Resurfacing and Shoulder Reconstruction The purpose of this Special Provision is to carry out the North Carolina Department of Transportation's policy of ensuring nondiscrimination in the award and administration of contracts financed in whole or in part with State funds. The work covered by this provision consists of clipping high shoulders and reconstructing the earth shoulder in accordance with Standard Drawing No. 560.01 and 560.02 of the Roadway Standard Drawings with the following exceptions: the width will be shown on typical sections, or to the existing shoulder point, whichever is nearer, as long as the desired typical is achieved. Seeding and mulching shall be performed upon completion of shoulder grading when earth borrow is used. This work shall be performed immediately after the resurfacing operations are complete as directed by the Engineer. Construct sinusoidal milled rumble strips on asphalt concrete in accordance with the details in the plans and as directed by the Engineer. This work also includes cleaning the milled surface; loading, hauling and stockpiling the milled material for use in recycled asphalt mixtures; and disposal of any excess milled material. Contractors must be able to prove experience installing the sinusoidal pattern both for their equipment and operator. Demonstrate to the Engineer on an initial 500 foot test section that the equipment and method will provide the desired ground surface finish and wave pattern. If the desired results are not being provided, as determined by the Engineer, provide different equipment or methods, or make necessary adjustments to provide the desired results. If the initial 500 foot section results are unsatisfactory, repair or replace the section as determined by the Engineer, at no additional cost to the Department. The Contractor's attention is directed to the fact that there are areas of existing pavement on this project that will require repair prior to resurfacing. Patch the areas that, in the opinion of the Engineer, need repairing. The areas to be patched will be delineated by the Engineer prior to the Contractor performing repairs. At the contractor's option, the use of an electronic ticketing system for reporting individual and cumulative asphalt material deliveries may be utilized on this project. At the preconstruction conference, the contractor shall notify the Engineer if they intend to utilize an electronic ticketing system for reporting individual and cumulative asphalt material deliveries to the project. Furnish, install and maintain snowplowable delineation. There are five snowplowable delineation alternate options approved for use in North Carolina. They include the following markers and markings options: (1) Polycarbonate H-shaped Markers (2) Inlaid Raised Pavement Markers (3) 10' Rumble Skips (4) Inlaid Cradle Markers (5) 10' Inlaid Pavement Markings Only one type of snowplowable delineation will be allowed on a single project. The North Carolina Department of Transportation will administer a custom version of the Federal On-the-Job Training (OJT) Program, commonly referred to as the Alternate OJT Program. All contractors (existing and newcomers) will be automatically placed in the Alternate Program. Standard OJT requirements typically associated with individual projects will no longer be applied at the project level. Instead, these requirements will be applicable on an annual basis for each contractor administered by the OJT Program Manager. On the Job Training shall meet the requirements of 23 CFR 230.107 (b), 23 USC - Section 140, this provision and the On-the-Job Training Program Manual. The Alternate OJT Program will allow a contractor to train employees on Federal, State and privately funded projects located in North Carolina. However, priority shall be given to training employees on NCDOT Federal-Aid funded projects.

GC Bidding

Roads / Highways

$3,000,000.00

Public - State/Provincial

Paving, Site Work

31

5

4

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
131
Active Projects
64
Bidding Soon
1,305
All Active Projects
557
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 19, 2024

January 20, 2025

img_map_placeholder

Multiple Locations, Carthage, NC


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.